Development Permit Details
21 123522 00 CO
Permit- Number
- 21 123522 00 CO
- Type
- Commercial Permit - DS - Commercial - New
- Status
- Permit Issued
- Details
- CO-DOLLAR GENERAL
- Description
- DOLLAR GENERAL (fka Project Justify) *****CIVIL SITE WORK (DISTRIBUTION/STORAGE BUILDINGS)
Person Details
SCANNELL PROPERTIES LLC
- Roles
- Responsible Utility Billing Contact, Paid By, Applicant
- Address
-
8801 RIVER CROSSING BV STE 300
INDIANAPOLIS IN 46240
SCOTT ZOLLINGER
- Roles
- Contractor
- Address
-
3871 LANGLEY ST SE
SALEM OR 97317
ELIJAH POE
- Roles
- Contact
- Address
- SALEM
ELAN DESIGN LAB
- Roles
- Engineer
- Address
-
310 4TH AV S STE 1006
MINNEAPOLIS MN 55415
JAKE KURTH
- Roles
- Paid By
- Address
-
8801 RIVER CROSSING BV STE 300
INDIANAPOLIS IN 46240
WESTECH ENGINEERING INC
- Roles
- Engineer
- Address
-
3841 FAIRVIEW INDUSTRIAL DR SE SUITE 100
SALEM OR 97302-1192
Property Details
Info
- Project Coordinator
- CURT PELLATZ
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- 70.5
- In Urban Service Area?
- No
- County Name
- Marion
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal regulations. Work within existing wetlands may require a separate permit. Contractor to follow all protocol for inadvertent discovery in the event of cultural material and/or archaeological finds.
- Water Service Level
- S1
- USGS Elevation
- 234
- PSI
- 90
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- No
- Domestic Water Meter Type
- Disk
- Domestic Water Service Line Size
- 6
- Domestic Water Meter Size
- 6-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- 1200-C
- Copy of DEQ Permit Submitted?
- Yes
- Adjacent to Waterway/Wetlands?
- Yes
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- No
- Install Irrigation Water Service Line
- No
- Irrigation Water Meter Type
- Disk
- Driveway Req'd
- New
- Driveway Location
- Logistics
- Driveway #2 Req'd
- Class 1 New
- Driveway #2 Width
- 24
- Driveway #2 Location
- Logistics
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- None
- Sidewalk Width
- 5
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 0
- Storm Location
- Outfall to existing Mill Creek Facility
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Type
- None
- Sewer Tap Type
- None
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 5
- Sewer Location
- Connection to existing main
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- Commercial Vehicle Trips
- 1541
- New Impervious Area (sq ft)
- 2365424
Action Details
Agreements
-
PSFA
- Status:
- Approved
- Completed Date:
- 8/31/2023
- Assigned Staff:
- Jason Valyou
- View Details
Info
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 12/30/2022
- Assigned Staff:
- Curtis Pellatz
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 12/4/2022
- Assigned Staff:
- Curtis Pellatz
- View Details
-
Floodplain Development Review
- Status:
- Approved
- Completed Date:
- 10/24/2022
- Assigned Staff:
- Robin Dalke
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Inspected
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Inspections
-
Sewer Inspection
- Status:
- Approved
- Completed Date:
- 11/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Storm Inspection
- Status:
- Approved
- Completed Date:
- 11/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Driveway Inspection
- Status:
- Inspected
- Assigned Staff:
- PW Inspector
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 11/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Detention Inspection
- Status:
- Approved
- Completed Date:
- 11/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
ADA Ramps
- Status:
- Approved
- Completed Date:
- 11/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Street Trees
- Status:
- Closed
- Completed Date:
- 6/12/2023
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 2/27/2024
- Assigned Staff:
- Devin Newstrand
- View Details
Info