Development Permit Details
23 124538 00 BP
Permit- Number
- 23 124538 00 BP
- Type
- Building Permit - Commercial - Interior Alteration
- Status
- Issued
- Details
- 1820 LANCASTER DRIVE NE
- Description
- Project will remove approx. 64 lineal feet of interior, non-load bearing wall and install approx. 35 lineal feet of interior, non-load bearing wall within a 1,200 sq. ft unit. In addition, carpet and vinyl floor covering will be replaced with laminate.
Person Details
VICTOR DODIER
- Roles
- Contractor, Owner, Applicant, Contact, Paid By
- Address
-
PO BOX 642
SALEM OR 97308
Property Details
Info
- Contractors' Construction Board #
- OWNER
- Valuation
- 7000.00
- Sq Ft - finished
- 3000
- Number of Floors
- 1
- Zoning
- CR and RM2
- In Floodplain?
- No
Action Details
Application Intake
-
Application Intake
- Status:
- Accept Plans
- Completed Date:
- 12/22/2023
- Assigned Staff:
- Permit Technician
- View Details
Info
Final B&S Inspections
-
Final Structural Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Final Fire Inspection
- Status:
- Open
- Assigned Staff:
- Deputy Fire Marshal
Info
Inspections-Building
-
Footing/Setback Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Foundation Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Grout/Rebar Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Underfloor Framing Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Shear Wall Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Roof Nailing Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Framing Inspection
- Status:
- Approved
- Completed Date:
- 4/25/2024
- Assigned Staff:
- Matthew Smith
- View Details
-
Insulation Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Sheetrock Nailing Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
-
Masonry Fireplace Inspection
- Status:
- Open
- Assigned Staff:
- Inspector Structural
Info
Plan Review
-
BAS Plan Review
- Status:
- Approved
- Completed Date:
- 1/31/2024
- Assigned Staff:
- Husam Oubari
- View Details
-
BAS Engineer Review
- Status:
- No review required
- Completed Date:
- 12/26/2023
- Assigned Staff:
- Ryan McGraw
- View Details
-
Planning Plan Review
- Status:
- Approved
- Completed Date:
- 2/1/2024
- Assigned Staff:
- Jacob Brown
- View Details
-
DS Plan Review
- Status:
- No review required
- Completed Date:
- 12/29/2023
- Assigned Staff:
- Matt Olney
- View Details
-
Fire Review
- Status:
- Approved
- Completed Date:
- 2/12/2024
- Assigned Staff:
- Fire Plan Review
- View Details
-
Final Review
- Status:
- Approved
- Completed Date:
- 2/13/2024
- Assigned Staff:
- PAC Shipping
- View Details
Info