Development Permit Details
23 106286 00 SF
Permit- Number
- 23 106286 00 SF
- Type
- Single Family - Partitioning - New
- Status
- Permit Issued
- Details
- SF - 2828 DOAKS FERRY ROAD NW
- Description
- PARTITION REVIEW FOR A 3-LOT PARTITION
Person Details
MATTHEW PERRY
- Roles
- Applicant
- Address
-
2828 DOAKS FERRY RD NW
SALEM OR 97304
DALKE CONSTRUCTION CO INC
- Roles
- Contractor
- Address
-
2180 16TH ST NE
SALEM OR 97301-0496
Property Details
Info
- SDC's Bancrofted?
- No
- Temporary Access Fee
- Not Applicable
- Jurisdiction
- Salem
- Illahe?
- No
- Pringle Creek Community / Fairview?
- No
- Install Domestic Water Meter?
- No
- Install Domestic Water Service Line
- New
- Domestic Water Service Line Size
- 1-inch
- Water Service Level
- W1
- USGS Elevation
- 250
- PSI
- 109
- Geo Review Req'd?
- No
- Excavation/Fill Permit Req'd
- No
- Erosion Control Permit Req'd?
- City Permit
- Adjacent to Waterway/Wetlands?
- No
- Driveway Req'd
- None
- Driveway Location
- DOAKS FERRY RD
- Driveway #2 Req'd
- None
- Driveway Closure Req'd
- No
- Sidewalk Req'd?
- None
- ADA Ramp?
- No
- Sidewalk Width
- 5
- Sidewalk Street Name
- DOAKS FERRY RD
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- None
- Street Opening Required?
- Street Cut (Collector/Arterial)
- # of Street Cuts
- 2
- Street Opening Comments
- Two new sewer laterals
- Sewer?
- None
- Length of Sewer Pipe
- 30
- Sewer Location
- Doaks Ferry Road NW
- Sewer Disconnect
- None
- Sewer Tap Type
- Main
- Sewer Tap Size
- 4-inch
- Sewer Main Size
- 8-inch
- Sewer Main Pipe Material
- CO
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- NFIP Community Name & Community Number
- Salem, City of and 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- County Name
- Polk
Action Details
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 6/3/2025
- Assigned Staff:
- PW Coordinator
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 6/3/2025
- Assigned Staff:
- Tiffany Russell
- View Details
Info
PW Inspections
-
Sewer Tap Installation
- Status:
- Open
- Assigned Staff:
- PW Sewer
-
Sewer Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Initial Street Opening Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Final Public Works Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Erosion Control Inspection
- Status:
- Inactive
- Assigned Staff:
- PW Inspector
- View Details
-
Stormwater Facility Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Stormwater Facility Landscaping Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Sewer Tap Installation
- Status:
- Open
- Assigned Staff:
- PW Sewer
Info
PW Water Inspections
-
Water Tap Installation
- Status:
- Open
- Assigned Staff:
- PW Water Group
-
Water Tap Installation
- Status:
- Open
- Assigned Staff:
- PW Water Group
Info