Development Permit Details
22 119230 00 CO
- Number
- 22 119230 00 CO
- Type
- Commercial Permit - DS - Commercial - New
- Status
- Completed
- Details
- CO-4405 TURNER ROAD SE
- Description
- ********CIVIL SITE WORK FOR NEW WAREHOUSE BUILDING. INCLUDES LANDSCAPING**********
Person Details
CRP/PDC SALEM TURNER ROAD OWNER, LLC
- Roles
- Applicant, Owner, Responsible Utility Billing Contact, Paid By
- Address
-
450 NEWPORT CENTER DR STE 405
NEWPORT BEACH CA 92660
KEVIN MORGAN
- Roles
- Contact
- Address
-
4875 SW GRIFFITH DR STE 100
BEAVERTON OR 97005
BRIAN CANDAU
- Roles
- Contact, Paid By
- Address
- SALEM
ZAC CELLI
- Roles
- Paid By
- Address
-
450 NEWPORT CENTER DR STE 405
NEWPORT BEACH CA 92660
CHRISTOPHER THORNTON
- Roles
- Engineer
- Organization
- AAI ENGINEERING
- Address
-
4875 GRIFFITH DR STE 100
BEAVERTON OR 97005
JERRY REID
- Roles
- Contact
- Address
-
52598 MARIA LN
SCAPPOOSE OR 97056
CALVIN BUCK
- Roles
- Contact
- Address
-
52598 MARIA LN
SCAPPOOSE OR 97056
CORNICE CONSTRUCTION LLC
- Roles
- Contractor
- Address
-
52598 MARIA LN
SCAPPOOSE OR 97056
DAVID GILBERT
- Roles
- Contact
- Address
-
PO BOX 204
GASTON OR 97119
Property Details
Info
- Project Coordinator
- CURT PELLATZ
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- 10.2
- In Urban Service Area?
- No
- County Name
- Marion
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal Regulations
- Water Service Level
- G0
- USGS Elevation
- 224
- PSI
- 47
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- New
- Domestic Water Meter Type
- Disk
- Domestic Water Service Line Size
- 2-inch
- Domestic Water Meter Size
- 2-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- 1200-C
- Copy of DEQ Permit Submitted?
- No
- Adjacent to Waterway/Wetlands?
- Yes
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- No
- Irrigation Water Meter Type
- Disk
- Driveway Req'd
- New
- Driveway Location
- TURNER RD
- Driveway #2 Req'd
- Class 1 New
- Driveway #2 Width
- 20
- Driveway #2 Location
- Turner Road
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- New
- Sidewalk Width
- 5
- Sidewalk Street Name
- TURNER RD
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 17
- Storm Location
- Connect to new main in Turner Road as part of the the PC Permits
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Order Quantity
- 0
- Storm Tap Type
- None
- Sewer Tap Order Quantity
- 1
- Sewer Tap Type
- Main
- Sewer Tap Size
- 6
- Sewer Main Size
- 27
- Sewer Main Pipe Material
- CO
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 45
- Sewer Location
- Turner Road
- Is Floodplain Development Required?
- Ground Disturbing Activity
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- Source: How Located
- Other
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Flood Zone
- AE
- Base Flood Elevation
- 230
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- Yes
- ROW Dedication Description
- Turner Road Frontage
- Commercial Vehicle Trips
- 722
- New Impervious Area (sq ft)
- 329640
Action Details
Agreements
-
ROW Dedication
- Status:
- Approved
- Completed Date:
- 7/24/2023
- Assigned Staff:
- Curtis Pellatz
- View Details
-
PSFA
- Status:
- Approved
- Completed Date:
- 7/13/2023
- Assigned Staff:
- Jason Valyou
- View Details
Info
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- Curtis Pellatz
- View Details
Info
Inspections-Planning
-
Protected Tree Inspection
- Status:
- Finaled
- Completed Date:
- 6/13/2023
- Assigned Staff:
- Michael Conkey
- View Details
Info
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 5/26/2023
- Assigned Staff:
- PW Coordinator
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 5/26/2023
- Assigned Staff:
- Curtis Pellatz
- View Details
-
Floodplain Development Review
- Status:
- Approved
- Completed Date:
- 10/12/2022
- Assigned Staff:
- Robin Dalke
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Inspections
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 1/3/2024
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer/Storm Cross-Connect Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Sewer Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Driveway Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Sidewalk Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- Toby Cothran
- View Details
-
Detention Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- PW Inspector
- View Details
-
ADA Ramps
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- Toby Cothran
- View Details
-
Storm Inspection
- Status:
- Approved
- Completed Date:
- 6/21/2024
- Assigned Staff:
- Toby Cothran
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 9/6/2023
- Assigned Staff:
- PW Water Group
- View Details
-
Water Tap Installation
- Status:
- Completed by City
- Completed Date:
- 6/20/2024
- Assigned Staff:
- Devin Newstrand
- View Details
Info