Development Permit Details
22 110908 00 CO
- Number
- 22 110908 00 CO
- Type
- Commercial Permit - DS - Multi Family - New
- Status
- Completed
- Details
- CO-MAHONIA CROSSING PH 1_5120 SALAL STREET SE
- Description
- CIVIL SITE WORK FOR NEW 184 UNIT MULTIFAMILY SENIOR COMPLEX fka GATEWAY APARTMENTS PH 1 ****PLEASE SEE CHILD FOLDER FOR MORE SDCS ON WATER PERMIT***
Person Details
GATEWAY PHASE 1 LIMITED PARTNERSHIP
- Roles
- Applicant, Responsible Utility Billing Contact
- Address
-
126 NE ALBERTA ST STE 202
PORTLAND OR 97211
K AND E EXCAVATING
- Roles
- Contractor
- Address
-
3871 LANGLEY ST SE
SALEM OR 97317-9322
MEGAN MYERS
- Roles
- Contact
- Address
-
830 NE HOLLADAY ST
PORTLAND OR 97232
WESTECH ENGINEERING INC
- Roles
- Engineer
- Address
-
3841 FAIRVIEW INDUSTRIAL DR SE SUITE 100
SALEM OR 97302-1192
THOMAS ELDRIDGE
- Roles
- Contact, Paid By, Owner
- Address
-
126 NE ALBERTA ST STE 202
PORTLAND OR 97211
Property Details
Info
- Project Coordinator
- CURT PELLATZ
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- 7.8
- In Urban Service Area?
- Yes
- County Name
- Marion
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal Regulations.
- Water Service Level
- S2
- USGS Elevation
- 380
- PSI
- 94
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- No
- Domestic Water Meter Type
- Disk
- Domestic Water Service Line Size
- 4
- Domestic Water Meter Size
- 4-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- 1200-C
- Copy of DEQ Permit Submitted?
- Yes
- Adjacent to Waterway/Wetlands?
- No
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- No
- Irrigation Water Meter Type
- Disk
- Driveway Req'd
- New
- Driveway Location
- SALAL ST
- Driveway #2 Req'd
- None
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- New
- Sidewalk Width
- 5
- Sidewalk Length
- 1246
- Sidewalk Street Name
- SALAL ST
- Sidewalk Location
- Property Line
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 20
- Storm Location
- Connection to new Public system constructed as part of Woodscape Green North Subdivision. City Permit 22-107732-PC
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Type
- None
- Sewer Tap Order Quantity
- 2
- Sewer Tap Type
- New Manhole
- Sewer Tap Size
- 8
- Sewer Main Size
- 8
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 50
- Sewer Location
- Private taps to existing main in Sala Street
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- ROW Dedication Description
- ROW will be dedicated with the Final Plat.
- Number of Dwelling Units
- 184
- Commercial Vehicle Trips
- 858
- New Impervious Area (sq ft)
- 193644.00
Action Details
Agreements
-
Improvement Agreement
- Status:
- Closed
- Completed Date:
- 7/7/2023
- Assigned Staff:
- Curtis Pellatz
- View Details
-
PSFA
- Status:
- Approved
- Completed Date:
- 10/22/2024
- Assigned Staff:
- Jason Valyou
- View Details
Info
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- Curtis Pellatz
- View Details
Info
Plan Review
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 11/4/2022
- Assigned Staff:
- Curtis Pellatz
- View Details
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 11/4/2022
- Assigned Staff:
- Curtis Pellatz
- View Details
-
Landscape Review
- Status:
- Closed
- Completed Date:
- 11/4/2022
- Assigned Staff:
- Curtis Pellatz
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Inspections
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Storm Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Driveway Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Sidewalk Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Detention Inspection
- Status:
- Approved
- Completed Date:
- 1/17/2025
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 12/6/2023
- Assigned Staff:
- Greg Presser
- View Details
Info