Land Use Action Details
20 102371 00 DR
- Number
- 20 102371 00 DR
- Type
- Design Review - NO LONGER USED - DR Dev Class 3 - New
- Status
- Approved with Conditions
- Case Number
- DR-CU-SPR-ADJ-DAP20-02
- Details
- 5611 WOODSIDE DR SE
- Description
- Summary: An application to develop an 18-unit multiple family residential development, with associated site improvements. Request: A conditional use permit, Class 3 design review, Class 3 site plan review, and Class 2 driveway approach permit application for a new multiple family residential development consisting of two 9-unit buildings, with associated site improvements including an off-street parking area and common open space. The application also includes a Class 2 adjustment request to: 1) Reduce the minimum number of required off-street parking spaces from 27 to 26; and 2) Reduce the minimum spacing between the proposed driveway approach and Woodside Drive SE from 370 feet to approximately 200 feet. For property approximately 0.67 acres in size, zoned IC (Industrial Commercial), and located at 5611 Woodside Drive SE (Marion County Assessor map and tax lot number(s): 083W14CB / 02400).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
NOPH Affidavit | PDF - Adobe | 147 KB | View/Download |
NOD Affidavit | PDF - Adobe | 96 KB | View/Download |
107-Decision | PDF - Adobe | 4 MB | View/Download |
114-Open Record Memo | PDF - Adobe | 109 KB | View/Download |
111- Staff Report PC | PDF - Adobe | 4 MB | View/Download |
112-Attachments for Staff Report | PDF - Adobe | 4 MB | View/Download |
114-Comments Submitted by Portwood | PDF - Adobe | 63 KB | View/Download |
114-Comments Submitted by Salem Keizer School District | PDF - Adobe | 541 KB | View/Download |
114-Comments Submitted by PGE | PDF - Adobe | 429 KB | View/Download |
114-Comments Submitted by Cherriots | PDF - Adobe | 102 KB | View/Download |
PDF - Adobe | 7 MB | View/Download | |
PDF - Adobe | 50 MB | View/Download | |
54-Findings DAP Spacing Adjustment | PDF - Adobe | 137 KB | View/Download |
54-Findings-Parking-ADJ | PDF - Adobe | 140 KB | View/Download |
54-Findings-DAP-REV02 | PDF - Adobe | 206 KB | View/Download |
102-Hearing Notice PC | PDF - Adobe | 1 MB | View/Download |
129-Hearing Confirmation Letter | PDF - Adobe | 885 KB | View/Download |
100-RFC | PDF - Adobe | 1 MB | View/Download |
116-Incomplete Letter | PDF - Adobe | 308 KB | View/Download |
101-Attachments for RFC | PDF - Adobe | 1 MB | View/Download |
69-SDR9-EROSIONCONTROLDETAILS-REV03 | PDF - Adobe | 608 KB | View/Download |
69-SDR5-PRELIMINARYGRADINGANDDRAINAGEPLAN-REV03 | PDF - Adobe | 1009 KB | View/Download |
68-SDR8-EROSIONCONTROLNOTES-REV03 | PDF - Adobe | 1 MB | View/Download |
68-SDR7-EROSIONCONTROLPLAN-REV03 | PDF - Adobe | 784 KB | View/Download |
62-SDR6-PRELIMINARYUTILITYPLAN-REV03 | PDF - Adobe | 865 KB | View/Download |
61-SDR2-EXISITNGCONDITIONSPLAN-REV03 | PDF - Adobe | 967 KB | View/Download |
60-SDR4-OPENSPACEPLAN-REV03 | PDF - Adobe | 437 KB | View/Download |
60-SDR3-PRELIMINARYSITEPLAN-REV03 | PDF - Adobe | 637 KB | View/Download |
60-SDR1-COVERSHEET-REV03 | PDF - Adobe | 1004 KB | View/Download |
54-Written-Findings-DR-REV03.Salem | PDF - Adobe | 312 KB | View/Download |
73-Preliminary-Drainage-Report-REV02 | PDF - Adobe | 7 MB | View/Download |
50-Class-1-Adjustment-Application-REV02 | PDF - Adobe | 121 KB | View/Download |
54-Written-Findings-Parking-Class1-Adjustment.REV02 | PDF - Adobe | 140 KB | View/Download |
60-SDR3-SITE-PLAN-REV02 | PDF - Adobe | 601 KB | View/Download |
54-Written-Findings-DR-REV02.Salem | PDF - Adobe | 283 KB | View/Download |
73-Preliminary-Drainage-Report-REV01 | PDF - Adobe | 7 MB | View/Download |
69-SDR5-PRELIMINARYGRADINGAN DRAINAGEPLAN-REV01 | PDF - Adobe | 1 MB | View/Download |
61-SDR2-EXISITNGCONDITIONSPLAN-REV01 | PDF - Adobe | 966 KB | View/Download |
60-SDR4-OPENSPACEPLAN-REV01 | PDF - Adobe | 382 KB | View/Download |
60-SDR3-PRELIMINARYSITEPLAN-REV01 | PDF - Adobe | 655 KB | View/Download |
54-Written-Findings-SetbackAdjustment-REV01 | PDF - Adobe | 133 KB | View/Download |
54-Written-Findings-SPR-REV01 | PDF - Adobe | 170 KB | View/Download |
54-Written-Findings-DR-REV01 | PDF - Adobe | 348 KB | View/Download |
54-Written-Findings-DAP-REV01 | PDF - Adobe | 259 KB | View/Download |
54-Written-Findings-AdjustmentDrivewaySpacing-REV01 | PDF - Adobe | 140 KB | View/Download |
50-Adjustment-Application-REV01 | PDF - Adobe | 133 KB | View/Download |
Person Details
MOUNTAIN WEST INVESTMENT CORPORATION
- Roles
- Applicant
- Address
-
201 FERRY ST SE SUITE 400
SALEM OR 97301
Property Details
Info
- Comprehensive Plan
- IC and SF
- Zoning
- IC and RA
- Overlay Zone
- None None
- Neighborhood Association
- South Gateway Neighborhood Association
- Ward #
- 4
Action Details
Plan Review
-
PW PM Review
- Status:
- Complete
- Completed Date:
- 6/12/2020
- Assigned Staff:
- Jennifer R Scott
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Brandon Pike
-
Building and Safety Comments
- Status:
- Complete
- Completed Date:
- 6/17/2020
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Complete
- Completed Date:
- 6/17/2020
- Assigned Staff:
- Fire Marshal
- View Details
-
Staff Report Available
- Status:
- Complete
- Completed Date:
- 6/30/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Public Hearing
- Status:
- Complete
- Completed Date:
- 7/8/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Decision
- Status:
- Approved with Conditions
- Completed Date:
- 7/24/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Courtesy Expiration Letter
- Status:
- Letter Sent
- Completed Date:
- 6/21/2022
- Assigned Staff:
- Olivia Dias
- View Details
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 8/14/2020
- Assigned Staff:
- Brandon Pike
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 1/28/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 6/12/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 6/16/2020
- Assigned Staff:
- Brandon Pike
- View Details
Info