Land Use Action Details
18 115573 00 RP
- Number
- 18 115573 00 RP
- Type
- Site Plan Review - NO LONGER USED - Site Plan Review - Class 3 - New
- Status
- Completed - Approved
- Case Number
- DR-SPR-REP-PLA-ADJ-DAP18-08
- Details
- 2110 STRONG ROAD SE
- Description
- A consolidated application for a proposed 180-unit multiple family development on approximately 9.51 acres of the former Fairview Training Center site. The application includes the following: 1) A Class 3 Design Review and Class 3 Site Plan review for the proposed multiple family development; 2) A Replat to consolidate Lots 8 and 9 of the Lindburg Green subdivision plat into one lot, and consolidate and reconfigure Lots 6 and 7 of the Lindburg Green subdivision plat and Parcel 3 of Partition Plat No. 2014-03, in order to reconfigure existing lot boundaries within the subject property in order to accommodate the proposed development; and 3) A Property Line Adjustment to eliminate the property line between proposed consolidated Lot 8 and 9 of the Lindburg Green subdivision plat and the abutting property to the west in order to accommodate the proposed development; 4) A Class 2 Driveway Approach Permit for the proposed driveway onto Lindburg Road SE; and 5) A Class 2 Adjustment to: a) Allow Lot 6 of the proposed replat to fall below the minimum lot width and exceed the maximum lot depth required under the refinement plan. b) Allow the remainder of Parcel 3 as shown on the proposed replat to exceed the maximum lot depth required under the refinement plan; c) Allow the consolidated 6.8 acre portion of the subject property located west of Heritage Street to fall below the minimum lot width and exceed the maximum lot depth required under the refinement plan; d) Allow less than 70 percent of the lot/street frontage of the portion of the property within the VC (Village Center) area of the refinement plan along Lindburg Road and proposed Village Center Loop to be occupied by buildings placed at the minimum setback line as required under the refinement plan; e) Allow the minimum required floor-area-ratio (lot coverage) of the portion of the property within the VC (Village Center) area of the refinement plan north of Lindburg Road and west of proposed Village Center Loop to be less than the minimum 0.75 FAR required under the refinement plan; f) Allow upper floor building articulation and building eaves to project into the minimum 10-foot setback abutting a street required under the refinement plan; g) Allow Building No. 1, 2, 8, 14, and 17 to be setback beyond the maximum 20-foot setback abutting a street required under the refinement plan. h) Allow Building No. 17 to be setback less than the minimum required 10-foot setback abutting a street required under the refinement plan; i) Allow a proposed driveway approach onto Lindburg Road SE, which is designated as a collector street, where SRC 804.030(b)(2) requires corner lots which abut only local or collector streets to provide access to the street with the lower street classification; j) Allow the driveway approaches onto the proposed private streets within the development to exceed the maximum driveway approach widths required under the refinement plan; k) Allow five driveway approaches onto the private streets on the western portion of the subject property and three driveway approaches onto the private streets on the eastern side of the subject property where a maximum of two driveway approaches per parcel are allowed onto private streets under the refinement plan; and l) Allow the proposed parking lot located south of Building No. 17 to be setback from the eastern edge of the private street easement less than the minimum required 20 feet under the refinement plan. The subject property is approximately 9.51 acres in size, zoned FMU (Fairview Mixed-Use), and located in the 2100 to 2300 Blocks of Lindburg Road SE and Strong Road SE (generally north of Lindburg Road SE, South of Strong Road SE, and west of Reed Road SE) (Marion County Assessor Map and Tax Lot Numbers: 083W11A00600, 700, 800, 900, & 1002; and 083W1100100).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
115-Public Works Memo | PDF - Adobe | 2 MB | View/Download |
73-Stormwater Management Report | PDF - Adobe | 2 MB | View/Download |
64-Building Floor Plans & Elevations | PDF - Adobe | 31 MB | View/Download |
63-Landscaping Plans | PDF - Adobe | 2 MB | View/Download |
62-Grading & Utility Plans | PDF - Adobe | 16 MB | View/Download |
61-Existing Conditions Plan | PDF - Adobe | 1 MB | View/Download |
60-Site Plan | PDF - Adobe | 4 MB | View/Download |
COMPLETED TGE | PDF - Adobe | 274 KB | View/Download |
Person Details
MOUNTAIN WEST INVESTMENT CORPORATION
- Roles
- Applicant
- Address
-
201 FERRY ST SE SUITE 400
SALEM OR 97301
RICHARD BERGER
- Roles
- Applicant
- Address
-
201 FERRY ST SE SUITE 400
SALEM OR 97301
Property Details
Info
- Neighborhood Association
- Morningside Neighborhood Association
- Overlay Zone
- None
- Comprehensive Plan
- Mixed-Use
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 12/3/2018
- Assigned Staff:
- Jennifer R Scott
- View Details
-
PW Memo
- Status:
- Complete
- Completed Date:
- 12/12/2018
- Assigned Staff:
- Jennifer R Scott
- View Details
-
PW Final Report
- Status:
- Complete
- Completed Date:
- 12/14/2018
- Assigned Staff:
- Jennifer R Scott
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
-
Building and Safety Comments
- Status:
- Closed
- Completed Date:
- 11/29/2018
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Closed
- Completed Date:
- 12/4/2018
- Assigned Staff:
- Fire Marshal
- View Details
-
Decision
- Status:
- Approved with Conditions
- Completed Date:
- 2/13/2019
- Assigned Staff:
- Bryce Bishop
- View Details
-
Courtesy Expiration Letter
- Status:
- Open
- Assigned Staff:
- Bryce Bishop
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 3/1/2019
- Assigned Staff:
- Bryce Bishop
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Open
- Assigned Staff:
- Bryce Bishop
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 11/29/2018
- Assigned Staff:
- Bryce Bishop
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 11/28/2018
- Assigned Staff:
- Bryce Bishop
- View Details
Info