Development Permit Details
22 106057 00 CO
- Number
- 22 106057 00 CO
- Type
- Commercial Permit - DS - Commercial - Alteration
- Status
- Completed
- Details
- CO - SALEM NAVIGATION CENTER - 1185 22ND STREET SE
- Description
- ***CIVIL SITE WORK FOR THE CITY OF SALEM NAVIGATION CENTER (SHELTER WITH COUNSELING SUPPORT SERVICES)
Person Details
WOODBURN CONSTRUCTION CO
- Roles
- Contractor
- Address
-
PO BOX 129
WOODBURN OR 97071-0129
CITY OF SALEM-PUBLIC WORKS
- Roles
- Responsible Utility Billing Contact, Owner, Applicant, Paid By
- Address
-
555 LIBERTY ST SE STE 325
SALEM OR 97301-3513
TURNEY EXCAVATING INC
- Roles
- Contractor
- Address
-
PO BOX 21597
KEIZER OR 97307
HUMBER DESIGN GROUP, INC.
- Roles
- Engineer
- Address
-
117 SE TAYLOR ST SUITE 001
PORTLAND OR 97214
MERRYMAN BARNES ARCHITECTS
- Roles
- Designer
- Address
-
4713 N ALBINA AV STE 303
PORTLAND OR 97217
LUKE GMAZEL
- Roles
- Contact
- Address
-
PO BOX 14300
CITY OF SALEM PUBLIC WORKS ENGINEERING
AMY PROVOST
- Roles
- Contact
- Address
-
4713 N ALBINA AV STE 201
PORTLAND OR 97217
Property Details
Info
- In Urban Service Area?
- Yes
- County Name
- Marion
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- 1
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal Regulations. Private Plumbing Permits are required for all on-site utility installation (Please contact Building & Safety 503-588-6256). Any work performed within Public Right-of-Way requires a separate "Work In ROW" permit (Please contact Ron Adkins or Van Tran at 503-588-6211).
- Water Service Level
- G0
- USGS Elevation
- 180
- PSI
- 66
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- New
- Domestic Water Meter Type
- Disk
- Domestic Water Service Line Size
- 2-inch
- Domestic Water Meter Size
- 2-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- City Permit
- Adjacent to Waterway/Wetlands?
- No
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- No
- Install Irrigation Water Service Line
- No
- Driveway Req'd
- None
- Driveway #2 Req'd
- None
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- None
- Sidewalk Width
- 5
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- None
- Storm Disconnect
- No
- Street Opening Required?
- Collector/Arterial
- # of Street Cuts
- 1
- Street Opening Comments
- Trench cut for new sewer tap - not covered by PC work
- Bonded?
- Yes
- Storm Tap Type
- None
- Sewer Tap Order Quantity
- 1
- Sewer Tap Type
- Main
- Sewer Tap Size
- 6-inch
- Sewer Main Size
- 15-inch
- Sewer Main Pipe Material
- PVC
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 40
- Sewer Location
- 22ND STREET SE
- Sewer Disconnect
- Individual - Abandonment
- Is Floodplain Development Required?
- Ground Disturbing Activity
- Elevation Certificate Req'd?
- No
- Horizontal Datum
- NAD 1927
- Source: How Located
- Other
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Map and Panel Number
- 41047C0342
- Suffix
- H
- Firm Index Date
- 1/2/2003
- Firm Panel Effective/Revised Date
- April 30, 2010
- Flood Zone
- AE
- Base Flood Elevation
- N/A
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- Commercial Vehicle Trips
- 0
- New Impervious Area (sq ft)
- 0
Action Details
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Approved
- Completed Date:
- 5/12/2023
- Assigned Staff:
- Matt Olney
- View Details
Info
Plan Review
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 8/18/2022
- Assigned Staff:
- Matt Olney
- View Details
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 8/18/2022
- Assigned Staff:
- PW Coordinator
- View Details
-
Floodplain Development Review
- Status:
- Complete
- Completed Date:
- 8/10/2022
- Assigned Staff:
- Robin Dalke
- View Details
Info
PW Environmental Services
-
Environmental Services Inspection
- Status:
- Approved
- Completed Date:
- 5/11/2023
- Assigned Staff:
- Environmental Services
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Approved
- Completed Date:
- 4/6/2023
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Inspections
-
Sewer Disconnect Inspection
- Status:
- Approved
- Completed Date:
- 9/29/2022
- Assigned Staff:
- PW Inspector
- View Details
-
Permanent Sewer Disconnect
- Status:
- Complete
- Completed Date:
- 9/29/2022
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 9/29/2022
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Inspection
- Status:
- Approved
- Completed Date:
- 3/13/2023
- Assigned Staff:
- PW Inspector
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 4/6/2023
- Assigned Staff:
- PW Inspector
- View Details
-
Initial Street Opening Inspection
- Status:
- Approved
- Completed Date:
- 3/13/2023
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 11/17/2022
- Assigned Staff:
- Greg Presser
- View Details
-
Water Tap Installation
- Status:
- Completed by City
- Completed Date:
- 11/17/2022
- Assigned Staff:
- Greg Presser
- View Details
Info
PW Water Quality & Treatment Inspections
-
PW Backflow Device Inspection
- Status:
- Approve with Corrections
- Completed Date:
- 3/31/2023
- Assigned Staff:
- Scott Ruyle
- View Details
Info