1 |
|
4/30/2025 |
Leif Nelson |
Inspected |
APPROVED 5 SHEARWALL FTGS FOR POUR #1 |
2 |
|
5/6/2025 |
Leif Nelson |
Inspected |
APPROVED 7 SHEARWALL FTGS FOR POUR #2 |
3 |
|
5/7/2025 |
Leif Nelson |
Inspected |
APPROVED REMAINING SHEARWALL FTGS FOR POURS 3,4 |
4 |
|
5/21/2025 |
Leif Nelson |
Corrections |
1. NEED TO VERIFY LEG LENGTH FOR REQUIRED HAIRPINS AT ENDS OF INDICATED WALLS AS WELL AS LENGTH OF 90 DEGREE CORNER RE-INFORCING ALSO INSTALL REQUIRED HAIRPINS AT HORIZONTAL DBA BARS . 2. MAINTAIN SEPERATION OF ALL BARS PER PLAN |
5 |
|
5/23/2025 |
Leif Nelson |
Inspected |
CORRECTIONS OK FOR 7 INDICATED SHOTCRETE WALLS |
6 |
|
7/2/2025 |
Matthew Smith |
Inspected |
|
7 |
|
7/9/2025 |
Leif Nelson |
Inspected |
APPROVED 1ST AND 2ND AREAS FOR SOG POURBACKS |
8 |
|
7/10/2025 |
Leif Nelson |
Inspected |
APPROVED REMAINING SLAB POURBACKS AT SHOTCRETE WALLS |