Process Details

Description
Shear Wall Inspection
Folder Number
23 121835 00 BP
Folder Details
835 COMMERCIAL STREET SE
Permit Type
Building Permit - Commercial
Scheduled Date
8/7/2025
Completed Date
8/7/2025
Assigned Staff
Leif Nelson

Process Comments

Comment Number Scheduled Date Comment Date Staff Result Comment
1 3/19/2025 Leif Nelson Inspected COUNSEL
2 4/3/2025 PAC Portal Cancel Inspection Request Cancelled by PACPORTAL ()
3 4/7/2025 PAC Portal Cancel Inspection Request Cancelled by PACPORTAL ()
4 4/9/2025 Leif Nelson Inspected 1. ENSURE NAILING INTO ACTUAL HD STUDS PER PLAN ... THEN APPROVED MAJORITY OF 3RD FLOOR EXTERIOR NAILING ... STRAPS AND HD'S TO COME
5 4/23/2025 Leif Nelson Inspected APPROVED 3RD FLOOR EAST AND WEST EXTERIOR WALLS
6 6/11/2025 Matthew Smith Inspected EXTERIOR GROUND FLOOR - NOT A COMPLETE INSPECTION MISSING NAILING IN AREAS
7 6/16/2025 Leif Nelson Inspected 1. ADD NAILS AT BOTTOM EDGE 2ND FLOOR CANTILEVER SOUTH WALL 2. INSTALL REQUIRED STRAP AT WEST SIDE 3. COMPLETE STRAP AT 2ND FLOOR AT WEST END OF STRAP... THEN APPROVED EXTERIOR FOR COVER ... INTERIORS AND DOUBLE SIDED WALLS TO COME.
8 6/23/2025 Leif Nelson Inspected verified ply nailing at indicated mech chases
9 7/7/2025 Leif Nelson Corrections 1. ensure proper location of indicated 2nd and 3rd floor hd's at east wall ...
10 7/17/2025 Leif Nelson Inspected VERIFIED 2ND FLOOR CORRECTIONS ...STILL NEED TO VERIFY COMPLETED 2 SIDED WALLS AT 1ST FLOOR
11 7/31/2025 Leif Nelson Inspected APPROVED 2ND LAYERS OF 2 SIDED WALLS AT 1ST FLOOR
12 8/4/2025 Leif Nelson Inspected APPROVED 2 SIDED WALLS AT 2ND AND 3RD FLOORS
13 8/7/2025 Leif Nelson Approved APPROVED REMAINING 2 SIDED WALLS