| 1 |
|
3/19/2025 |
Leif Nelson |
Inspected |
COUNSEL |
| 2 |
|
4/3/2025 |
PAC Portal |
Cancel Inspection Request |
Cancelled by PACPORTAL () |
| 3 |
|
4/7/2025 |
PAC Portal |
Cancel Inspection Request |
Cancelled by PACPORTAL () |
| 4 |
|
4/9/2025 |
Leif Nelson |
Inspected |
1. ENSURE NAILING INTO ACTUAL HD STUDS PER PLAN ... THEN APPROVED MAJORITY OF 3RD FLOOR EXTERIOR NAILING ... STRAPS AND HD'S TO COME |
| 5 |
|
4/23/2025 |
Leif Nelson |
Inspected |
APPROVED 3RD FLOOR EAST AND WEST EXTERIOR WALLS |
| 6 |
|
6/11/2025 |
Matthew Smith |
Inspected |
EXTERIOR GROUND FLOOR - NOT A COMPLETE INSPECTION MISSING NAILING IN AREAS |
| 7 |
|
6/16/2025 |
Leif Nelson |
Inspected |
1. ADD NAILS AT BOTTOM EDGE 2ND FLOOR CANTILEVER SOUTH WALL 2. INSTALL REQUIRED STRAP AT WEST SIDE 3. COMPLETE STRAP AT 2ND FLOOR AT WEST END OF STRAP... THEN APPROVED EXTERIOR FOR COVER ... INTERIORS AND DOUBLE SIDED WALLS TO COME. |
| 8 |
|
6/23/2025 |
Leif Nelson |
Inspected |
verified ply nailing at indicated mech chases |
| 9 |
|
7/7/2025 |
Leif Nelson |
Corrections |
1. ensure proper location of indicated 2nd and 3rd floor hd's at east wall ... |
| 10 |
|
7/17/2025 |
Leif Nelson |
Inspected |
VERIFIED 2ND FLOOR CORRECTIONS ...STILL NEED TO VERIFY COMPLETED 2 SIDED WALLS AT 1ST FLOOR |
| 11 |
|
7/31/2025 |
Leif Nelson |
Inspected |
APPROVED 2ND LAYERS OF 2 SIDED WALLS AT 1ST FLOOR |
| 12 |
|
8/4/2025 |
Leif Nelson |
Inspected |
APPROVED 2 SIDED WALLS AT 2ND AND 3RD FLOORS |
| 13 |
|
8/7/2025 |
Leif Nelson |
Approved |
APPROVED REMAINING 2 SIDED WALLS |