1 |
|
10/11/2024 |
Leif Nelson |
Inspected |
APPROVED DETENTION PONF WALL FTGS AND ELEVATOR PIT SOG |
2 |
|
10/21/2024 |
Leif Nelson |
Inspected |
VERIFIED REBAR AT SOUTHERN BLDG FDTN AND AT ELEVATOR PIT WALLS ...HD'S AND ANCH BOLTS TO COME |
3 |
|
10/24/2024 |
Leif Nelson |
Inspected |
VERIFIED HD AND ANCHOR BOLTS AT SOUTH WALL |
4 |
|
10/31/2024 |
Chad Cooper |
Inspected |
PARTIAL-
APPROVED REBAR FOR SOUTH RETAINING WALL AT RAIN GARDEN. |
5 |
|
11/15/2024 |
Leif Nelson |
Inspected |
APPROVED 4 PAD FTGS EAST END ...ALSO PERIMETER FTGS AND WALLS EAST AND WEST ENDS ...ALSO PERIMETER FTGS AT NORTH END |
6 |
|
12/2/2024 |
Leif Nelson |
Inspected |
APPROVED REMAINING EXTERIOR FTGS AND STEMWALLS ... ALSO INDICATED INTRIOR PAD FTGS |
7 |
|
1/22/2025 |
Leif Nelson |
Inspected |
APPROVED SOG W/ EXP STRIP FTGS |