1 |
|
10/28/2024 |
Justin Guinan |
Inspected |
2nd and 3rd floor ok for cover, minus the south stairwell sidewall and the elevator heads.
As builts for omitted and added heads. |
2 |
|
11/5/2024 |
Janet Campbell |
Inspected |
1st floor main hydro passed
4th floor hydro passed
4th floor ok for cover, minus the corridor, south stairwell sidewall, and the elevator heads.
As builts for omitted and added heads. |
3 |
|
11/18/2024 |
PAC Portal |
Cancel Inspection Request |
Cancelled by PACPORTAL ([email protected]) |
4 |
|
11/19/2024 |
Janet Campbell |
Inspected |
1st floor hydro passed for the branch lines and the residential side
1st floor cover ok, minus the corridor, commercial side bathrooms, stairwell, and elevator.
As builts for omitted and added heads |
5 |
|
5/6/2025 |
Sara Roth |
Inspected |
1. Hydro of entire standpipe - Passed @ 220 psi.
2. Cover inspection of corridors on 1st, 2nd, and 3rd floors - okay for cover.
3. Cover of head in office bathroom on 1st floor, one head on second floor near library, and one head in southeast unit on 4th floor.
4. Unable to mark covered area on plans. Need approved as built drawings on site for cover inspections due to all the changes made.
5. Unable to cover 4th floor corridor due to the ceiling being masked off. |
6 |
|
6/2/2025 |
Sara Roth |
Inspected |
Cover inspection of corridor on 4th floor. Reinspected corridors on floors 1-3 with asbuilts. |