1 |
|
6/3/2024 |
Michael Conkey |
Inspected |
In process of installing fencing, not completed, appears to be to be on plan so far in installation |
2 |
|
6/5/2024 |
Michael Conkey |
Inspected |
fencing complete, dumpster within crz on paved area near 11094. Spoke with Ian on site who stated its been there since before they got there. Its a dumpster for the parks department and their equipment to move is being repaired. All trees to be protected are within tree protection, it has been simplified from drawing providing more protection but need to make sure specific trees in that area that will be adjusted when the decking goes in are marked. see tree 11091 and 10642 |
3 |
|
6/7/2024 |
Michael Conkey |
Inspected |
Fence protections still in place in excess of plans, OK. fence will need to be updated once boardwalk/platform is going to be started, other areas will are being worked first per onsite. reset for 20th for next inspection |
4 |
|
6/21/2024 |
Michael Conkey |
Inspected |
Fence still in place, fences include more area of protection that shown on plan. Work has started, trees and sidewalks have been removed. |
5 |
|
7/17/2024 |
Michael Conkey |
Inspected |
Met with Alex on site, Ian had just left. Talked to about some of the fencing that was down. There are times throughout the project that work is done within protections with hand tools, this was one of those times and fences are put back at end of day and only down when needed for the delicate inside work as shown on plans. |
6 |
|
7/31/2024 |
Michael Conkey |
Inspected |
|
7 |
|
8/14/2024 |
Michael Conkey |
Inspected |
|
8 |
|
8/28/2024 |
Michael Conkey |
Inspected |
|
9 |
|
9/11/2024 |
Michael Conkey |
Inspected |
|
10 |
|
9/25/2024 |
Michael Conkey |
Inspected |
|
11 |
|
10/9/2024 |
Michael Conkey |
Inspected |
|
12 |
|
10/23/2024 |
Michael Conkey |
Inspected |
|
13 |
|
11/6/2024 |
Michael Conkey |
Inspected |
work appears nearly complete, tree protection is not present but, no machinery on site and landscaping appears ready for inspection(mulch and plants, and new trees planted). |
14 |
|
12/4/2024 |
Michael Conkey |
Approved |
project appears complete, all protections removed, ready for final. |