1 |
|
2/28/2024 |
Leif Nelson |
Inspected |
APPROVED 1ST LIFTS CMU AT 2 STAIRWELLS AND 1 ELEVATOR |
2 |
|
4/8/2024 |
Leif Nelson |
Inspected |
APPROVED NEXT LIFTS AT 2 STAIRS AND THE ELEVATOR SHAFTS |
3 |
|
4/30/2024 |
Leif Nelson |
Inspected |
APPROVED NEXT LIFTS AT STAIR AND ELEVATOR SHAFTS |
4 |
|
5/20/2024 |
Leif Nelson |
Inspected |
APPROVED NEXT LIFTS AT STAIRS AND ELEVATOR |
5 |
|
6/5/2024 |
Leif Nelson |
Inspected |
APPROVED SOUTH END STAIRS AND ELEVATOR SHAFTS 3RD FLOOR |
6 |
|
6/18/2024 |
Leif Nelson |
Inspected |
1. COMPLETE VERT REBAR DOWELS PER PLAN ... THEN APPROVED NRTH STAIR 3RD FLOOR |
7 |
|
6/27/2024 |
Leif Nelson |
Inspected |
APPROVED NORTH STAIRS TO TOP OF WALL |
8 |
|
7/10/2024 |
Leif Nelson |
Inspected |
APPROVED 4TH FLOOR SOUTH STAIRWELL |
9 |
|
8/19/2024 |
Matthew Smith |
Inspected |
ELEVATOR TOP OF WALL |
10 |
|
9/6/2024 |
Leif Nelson |
Inspected |
APPROVED INFILL FTG AND FDTN AT ELECTRIC / RISER RM ... ALSO APPROVED FTGS FOR TRASH ENCLOSURE |
11 |
|
9/26/2024 |
Leif Nelson |
Inspected |
APPROVED TRASH ENCLOSURE WALLS |