1 |
|
8/24/2023 |
Clint Barber |
Inspected |
Approved 3 catch basins And piping. |
2 |
|
9/14/2023 |
Matthew Smith |
Inspected |
6' SUBGRADE DETENTION |
3 |
|
9/18/2023 |
Clint Barber |
Inspected |
6' subgrade detention system. |
4 |
|
9/21/2023 |
Clint Barber |
Inspected |
40'- 12' CPPE Storm south side fuel island. |
5 |
|
10/3/2023 |
Matthew Smith |
Inspected |
12" FROM BEEHIVE AND CATCH BASIN TO DETENTION |
6 |
|
10/9/2023 |
Clint Barber |
Inspected |
12" from Catch basins southside. |
7 |
|
10/19/2023 |
Clint Barber |
Inspected |
Tie in to existing. Southside. |
8 |
|
10/20/2023 |
Clint Barber |
Inspected |
Tie in from existing to new system. |
9 |
|
10/31/2023 |
Clint Barber |
Inspected |
Catch basin #2 Northside. |
10 |
|
11/21/2023 |
Matthew Smith |
Approved |
|