1 |
|
11/9/2023 |
Matthew Smith |
Inspected |
LOWER DRAG CONTECTORS |
2 |
|
11/30/2023 |
Leif Nelson |
Inspected |
COUNSEL ONLY |
3 |
|
12/8/2023 |
Leif Nelson |
Inspected |
APPROVED ALL FLOORS AND ROOF METAL DECK INSTALLS |
4 |
|
1/2/2024 |
Leif Nelson |
Inspected |
APPROVED PARAPET WALLS |
5 |
|
1/3/2024 |
Leif Nelson |
Inspected |
1. ADD ADDITIONAL FASTNERS TO CURBS PER ENGINEERING ... THEN APPROVED RTU CURBS TO STRUCTURE CONNECTIONS |
6 |
|
4/9/2024 |
Leif Nelson |
Inspected |
APPROVED WALL FRAMING AT STAIRS AND ELEVATOR |
7 |
|
4/16/2024 |
Leif Nelson |
Inspected |
APPROVED 1ST FLOOR WALLS AND HARD LIDS |
8 |
|
4/19/2024 |
Leif Nelson |
Inspected |
1. SEAL ALL PENETRATIONS FLOOR TO FLOOR FOR SMOKE PER OSSC 717 ... THEN APPROVED WALLS AND HARD LIDS AT 2ND AND 3RD FLOORS EXCEPT INSIDE OF STAIRS |
9 |
|
5/6/2024 |
Leif Nelson |
Inspected |
APPROVED SUSPENDED HARD LID OVER SOUTH STAIRS ...ALSO APPROVED FRAMING FOR BEAM WRAPPING |
10 |
|
5/23/2024 |
Leif Nelson |
Inspected |
APPROVED NORTH STAIRWELL |
11 |
|
6/14/2024 |
Leif Nelson |
Inspected |
APPROVED 1ST FLOOR CORRIDORS T-BAR ALSO CLASS RM T-BAR FOR BORDER COVER |
12 |
|
6/18/2024 |
Leif Nelson |
Inspected |
APPROVED REMAINING T-BAR ALL FLOORS EXCEPT INDICATED AREA 1ST FLOOR |
13 |
|
7/12/2024 |
Leif Nelson |
Approved |
APPROVED T-BAR AT ELEVATOR LOBBY |