1 |
|
2/29/2024 |
Roberto Rios |
Inspected |
SECOND FLOOR INTERIOR INSULATION INCLUDES MECHANICAL ROOM |
2 |
|
3/13/2024 |
Matthew Smith |
Inspected |
REMANING AREAS 2ND FLOOR AND BASEMENT |
3 |
|
3/26/2024 |
Roberto Rios |
Corrections |
CANCELLED BY CO/ CALLED LEFT MESSAGE AT 503-459-6713 |
4 |
|
3/28/2024 |
Roberto Rios |
Inspected |
2nd and third floors perimeter insilation nd fireproofing floor to floor |
5 |
|
4/12/2024 |
Roberto Rios |
Approved |
Thermal and Sound insulation second and third floors |
6 |
|
4/25/2024 |
Katie Alaga |
Inspected |
|
7 |
|
4/26/2024 |
Roberto Rios |
Inspected |
5th floor clear story |
8 |
|
11/18/2024 |
Roberto Rios |
Approved |
|