Grout/Rebar Inspection
Folder Number
22 117292 00 BP
Folder Details
155 COTTAGE ST NE
Permit Type
Building Permit - Commercial Phased
Scheduled Date
10/7/2024
Completed Date
11/18/2024
Assigned Staff
Inspector Structural

Process Comments

Comment Number Scheduled Date Comment Date Staff Result Comment
1 8/10/2023 Roberto Rios Inspected INSPECTED REBAR 2ND FLOOR A102S D15/ A104S CENTER SECTION AT 4RTH FOOR SPECIAL INSPECTION REPORT TO FOLLLOW
2 8/17/2023 Roberto Rios Inspected MOCK UP/ REBAR
3 9/20/2023 Roberto Rios Inspected LEVEL 1 INTERIOR SHEARWALL S351 D5 PERIMETER NW CORNER FOOTING D3 S350 PERIMETER SW CORNER FOOTING D4 S350 AREAWAY D6 S501 S202 D18 ON S611 GRID LINE C AT 2.2 S101 GRIDLINE E AT 4.7-6.3 G-E 1-2.2 8-6.8 SPECIAL INSPECTION REPORT TO FOLLOW
4 10/5/2023 Roberto Rios Inspected INSPECTED REINSFORMENT FOR SHEARWALLS G AND H/ E AND F S101/S304/S306/ INSPECTED MOCK UP .R044
5 10/23/2023 Roberto Rios Inspected AREAWAY S501 GRID 1 / E.8
6 11/2/2023 Roberto Rios Inspected REBAR GRID 5 AND E/ REFERENCE SHEETS S305/S103/S105/S110
7 11/6/2023 Roberto Rios Inspected INSPECTED FORMS /REBAR FOR PERIMETER SUPPORT LEDGER AT (E) CONC. BASEMENT WALL/ WEST WALL/ NORTH WALL S201/ S501
8 11/9/2023 Roberto Rios Inspected INSPECTED REBAR PLACEMENT OR PERIMETER SHEAR WALLS S102 - D5/S313 NW G-E LEVEL 2 / LEVEL 2 MODIFIED DETAIL S311 / S303
9 11/15/2023 Roberto Rios Inspected REBAR /GRID f.8 2-5.5 detail 311
10 11/16/2023 Roberto Rios Inspected INSPECTED FOOTINGS AT NORTH EAST CORNER S351 D1,2,AND 5 S350
11 11/17/2023 Roberto Rios Inspected level 4 GRIDs 5.5 - 6.5 detail 311
12 11/27/2023 Roberto Rios Inspected LEVEL 1 SE CORNER FOOTING/ S350 WEST AND SW LEVEL 3 F AND E SHEARWALLS S303 / SK 051.1 EAST AND NE LEVEL 3 H AND G SHEARWALLS S304 ENSURE ALL RFI'S ARE POPERLY SUBMMITTED/SPECIAL INSPECTION REPORT TO FOLLOW
13 12/12/2023 Roberto Rios Inspected SE CORNER GRADE LEVEL FOOTING REBAR/ S101 SW CORNER INFILL FOOTING SECTION SPECIAL INSPECTION REPORT TO FOLLOW
14 12/14/2023 Roberto Rios Inspected NE CORNER SHEARWALLS ALL LEVELS TO ROOF S301 S305 INTERIOR SHEARWALL AT STAIRS LEVEL 3 TO ROOF
15 1/8/2024 Roberto Rios Inspected UTILITY YARD NE/ S521 LEVEL 4 NORTH WEST CORNER AND NORTH WALL /SOUTH WALL OLD BLDG SECTION REBAR AT FLOOR LEVEL OK TO POUR S304/S307/S311 SPECIAL INSPECTION REPORT TO FOLLOW
16 1/24/2024 Roberto Rios Inspected LEVEL 5 SLAB SECTIONS BY STAIRS / L3 SOG PARTIAL S611 D8 / M1 /M2 DECKING S621
17 2/1/2024 Roberto Rios Inspected S101 FIRST STORY WALL INFILLS/ SPECIAL INSPECTION REPORT TO FOLLOW
18 2/9/2024 Roberto Rios Inspected FIRST FLOOR SOG INFILLS S101 D 3-10-11 S511
19 2/15/2024 Roberto Rios Inspected S501 AREA WAY/SOG ELECTRICAL RM AND RISER ROOMS S511 LEVEL 2 ,3, AND 4 TOPPING SLAB S511 S102/S103/ S104 S621
20 2/21/2024 Roberto Rios Inspected INTERIOR SOG INFILLS S101 LEVEL 1 HOUSEKEEPING PAD (7) ELECTRICAL AND MECH ROOM EQUIPMENT PADS
21 2/22/2024 Roberto Rios Inspected Rescheduled by contractor for next morning
22 2/23/2024 Roberto Rios Inspected S104 LEVEL 4 F8 6.6 TO 8
23 3/13/2024 Matthew Smith Inspected APPROVED FOOTINGS - RETAINING WALLS SOUTH SIDE
24 3/27/2024 Roberto Rios Inspected SOUTH RET WALL / W15 ELEV-W16
25 4/4/2024 Roberto Rios Inspected SOUTH RETAINING WALLS
26 4/12/2024 Roberto Rios Inspected SOUTH EXTERIOR WALL REINFORCEMENT AT LEVEL 1
27 5/6/2024 Roberto Rios Inspected EAST PLANTER WALL FOOTINGS / NORTH EAST FOOTINGS BY NORTH ENTRANCE RAMP
28 5/16/2024 Roberto Rios Inspected EAST PLANTER WALLS AND NORTH ENTRANCE FOUNDATION WALL
29 6/3/2024 Matthew Smith Inspected APPROVED FOOTINGS - WEST RETAINING
30 6/13/2024 Roberto Rios Inspected SOUTH retaining wall footings & WEST retaining walls-
31 7/3/2024 Roberto Rios Inspected FOOTING NORTH UTILITY YARD & WALLS AT SOUTH PATIO
32 7/15/2024 Roberto Rios Inspected FOOTING NORTH UTILITY YARD & WALLS AT SOUTH PATIO 3 FLAG POLE FOOTINGS EAST POURED PRIOR TO CITY INSPECTION APPROVED BASED ON SPECIAL INSPECTION REPORT, CONCRETE MIXED REPORT AND PICTURES
33 7/19/2024 Roberto Rios Inspected WALLS AT NORTH UTILITY YARD & WEST RETAINING WALLS.
34 7/19/2024 Roberto Rios Reopened
35 7/19/2024 Roberto Rios Reopened
36 7/19/2024 Roberto Rios Inspected WALLS AT NORTH UTILITY YARD & WEST RETAINING WALLS
37 7/29/2024 Roberto Rios Inspected NORTH SIDE FOOTINGS FOR TRUSH ENCLOSURE AND NORTH ADA RAMP / A465/ D9/D5/D6
38 8/7/2024 Roberto Rios Inspected NORTH SIDE TRASH ENCLOSURE WALLS / NORTH WALL FOR ADA RAMP SOUTH SIDE PATIO LAST FOOTINGS SECTION
39 8/7/2024 Roberto Rios Inspected NORTH SIDE TRASH ENCLOSURE WALLS NORTH SIDE WALL FOR ADA RAMP SOUTH C FOOTINGS REEMAINING SECTION
40 8/19/2024 Roberto Rios Inspected NORTH TRASH ENCLOSURE SOG S511/ D7 SOUTH PATIO CWALL REMAINING SECTION
41 8/28/2024 Roberto Rios Inspected NORTH SIDE RAMP 501 D4/ SOG FOR TRUSH ENCLOSURE/ SPECIAL INSPECTION REPORT TO FOLLOW
42 8/29/2024 Roberto Rios Inspected NORTH ADA RAMP AND SOG TRUSH ENCLOSURE
43 10/7/2024 Roberto Rios Inspected FLAT WORK NORTH EAST AREA
44 11/18/2024 Roberto Rios Approved