Process Details

Description
Framing Inspection
Folder Number
22 117292 00 BP
Folder Details
155 COTTAGE ST NE
Permit Type
Building Permit - Commercial Phased
Scheduled Date
9/16/2024
Completed Date
11/18/2024
Assigned Staff
Inspector Structural

Process Comments

Comment Number Scheduled Date Comment Date Staff Result Comment
1 8/17/2023 Roberto Rios Inspected STRAP INSTALLATION AT UNDER METAL ROOF ENTIRE PERIMETER/SPECIAL INSPECTION REPORT RECEIVED
2 11/2/2023 Roberto Rios Inspected S110 / METAL BEAMS AND COLUMNS / INTERIOR METAL STAIRS /PARTIAL/ SPECIAL INSPECTION REPORTS TO FOLLOW
3 12/13/2023 Roberto Rios Inspected S102 FIRE PROOFING SPRAY COLUMNS AND CEILING LEVEL 2 /EXCEPT AREAS AFFECTED BY DEMO/ SPECIAL INSPECTION REPORT TO FOLLOW
4 12/29/2023 Roberto Rios Inspected SECOND FLOOR INTERIOR SOFFIT APPROVED
5 1/23/2024 Roberto Rios Inspected SECOND FOOR INTERIOR STRUCTURAL/PENDING ALL RELATED DICIPLINES/FIRST LAYER ON DRYWALL AT UPPER PORTION OF INTERIOR WALLS AT NW CORNER INSPECTED
6 1/26/2024 Roberto Rios Inspected SW AND NW CORNER SHEARWALL REINFORCEMENT 4TH FLOOR S303 AND S304
7 2/29/2024 Roberto Rios Inspected 3RD FLOOR INTERIOR FRAMING
8 4/2/2024 Roberto Rios Inspected PERIMETER ROOF PARAPET FRAMING 4TH AND 5TH FLOOR FRAMING APPROVED PENDING ALL DICIPLINES APPROVAL SPECIAL INSPECTION REPORT TO FOLLOW
9 4/22/2024 Roberto Rios Inspected PARTIAL SHAFT INSPECTION 5TH FLOOR
10 5/10/2024 Roberto Rios Inspected APPROVED FRAMING FOR LEVEL 1 INSPECTED PARTIAL SHEETROCK AT LEVL 5 AS DISCUSSED ACTUAL INSPECTION DATE 5/9/24
11 5/30/2024 Matthew Smith Inspected PARAPETS 4 &5, T-BAR GRID - CLOUDS 2 &3
12 6/10/2024 Roberto Rios Inspected METAL STAIRS 1 AND 3
13 7/1/2024 Roberto Rios Inspected APPROVED CEILING COVER AT STAIR # 3/ 5TH FLOOR
14 7/9/2024 Roberto Rios Inspected LEVEL 1 CEILING COVER RESTROOMS AND OFFICES LEVEL 4 CEIILING GRID
15 7/26/2024 Roberto Rios Inspected HARD CEILINGS 1ST FLOOR/4TH AND 5TH CEILING GRIDS
16 7/31/2024 Roberto Rios Inspected 5TH FLOOR CEILING GRID
17 8/9/2024 Roberto Rios Inspected STAIR 2 , BETWEEN 3RD AND 5TH FLOOR/SOFFIT AREAS
18 8/20/2024 Roberto Rios Inspected FIRST FLOOR REMAINING CEILING GRID
19 9/16/2024 Roberto Rios Inspected HANDRAILS
20 11/18/2024 Roberto Rios Approved