1 |
|
5/2/2023 |
Clint Barber |
Inspected |
Partial- Storm MH 202 to 203. MH 202 to pond. |
2 |
|
6/9/2023 |
Clint Barber |
Inspected |
Partial - MH 203 to MH 207 |
3 |
|
7/31/2023 |
Clint Barber |
Inspected |
Line 700B. |
4 |
|
7/31/2023 |
Clint Barber |
Inspected |
Line 700A not 700B |
5 |
|
8/16/2023 |
Matthew Smith |
Inspected |
APPROVED STORM Line ALONG B A1 to B |
6 |
|
8/23/2023 |
Clint Barber |
Inspected |
Approved storm line. 200 G 200 H. |
7 |
|
9/27/2023 |
Clint Barber |
Inspected |
Approved storm line 600c to A4. |
8 |
|
10/16/2023 |
Matthew Smith |
Inspected |
600 D |
9 |
|
3/6/2024 |
Matthew Smith |
Inspected |
500 A& B CATCH BASIN AND TO OFF FALL AREA |