1 |
|
11/17/2022 |
Leif Nelson |
Inspected |
APPROVED INTERIOR PAD FTGS |
2 |
|
12/5/2022 |
Leif Nelson |
Inspected |
NORTH 1/3 SLAB ON GRADE APPROVED |
3 |
|
12/14/2022 |
Leif Nelson |
Inspected |
APPROVED NEXT 1/3 SOG |
4 |
|
1/18/2023 |
Leif Nelson |
Inspected |
APPROVED REMAINING SOG |
5 |
|
1/26/2023 |
Leif Nelson |
Inspected |
APPROVED PERIMETER PAD FTGS ... STRIP ETC TO COME |
6 |
|
2/14/2023 |
Leif Nelson |
Inspected |
APPROVED PANELS EAST ELEVATION |
7 |
|
2/15/2023 |
Matthew Smith |
Inspected |
TILT PANELS 2, 37, 38, 39, 41, 43, 44, 45, 46, 47, 49 |
8 |
|
2/21/2023 |
Leif Nelson |
Inspected |
APPROVED NEXT 7 INDICATED PANELS |
9 |
|
3/3/2023 |
Leif Nelson |
Inspected |
APPROVED REMAINING TILT PANELS AND REMAINDER OF EXTERIOR FTGS |
10 |
|
4/24/2023 |
Matthew Smith |
Inspected |
POUR BACK STRIPS |
11 |
|
5/18/2023 |
Leif Nelson |
Inspected |
1. MAINTAIN MINIMUM 2" COVERAGE ON TOP BARS PER PLAN ... THEN APPROVED TRASH ENCLOSURE FTGS |