Process Details

Description
Grout/Rebar Inspection
Folder Number
22 111611 00 BP
Folder Details
4668 TRUAX DRIVE SE
Permit Type
Building Permit - Commercial
Scheduled Date
5/18/2023
Assigned Staff
Inspector Structural

Process Comments

Comment Number Scheduled Date Comment Date Staff Result Comment
1 11/17/2022 Leif Nelson Inspected APPROVED INTERIOR PAD FTGS
2 12/5/2022 Leif Nelson Inspected NORTH 1/3 SLAB ON GRADE APPROVED
3 12/14/2022 Leif Nelson Inspected APPROVED NEXT 1/3 SOG
4 1/18/2023 Leif Nelson Inspected APPROVED REMAINING SOG
5 1/26/2023 Leif Nelson Inspected APPROVED PERIMETER PAD FTGS ... STRIP ETC TO COME
6 2/14/2023 Leif Nelson Inspected APPROVED PANELS EAST ELEVATION
7 2/15/2023 Matthew Smith Inspected TILT PANELS 2, 37, 38, 39, 41, 43, 44, 45, 46, 47, 49
8 2/21/2023 Leif Nelson Inspected APPROVED NEXT 7 INDICATED PANELS
9 3/3/2023 Leif Nelson Inspected APPROVED REMAINING TILT PANELS AND REMAINDER OF EXTERIOR FTGS
10 4/24/2023 Matthew Smith Inspected POUR BACK STRIPS
11 5/18/2023 Leif Nelson Inspected 1. MAINTAIN MINIMUM 2" COVERAGE ON TOP BARS PER PLAN ... THEN APPROVED TRASH ENCLOSURE FTGS