1 |
|
1/20/2023 |
Leif Nelson |
Inspected |
REMOVE STANDING WATER ... THEN APPROVED INTERIOR PAD FTGS |
2 |
|
2/2/2023 |
Leif Nelson |
Inspected |
1. MAINTAIN REQUIRED CLEARANCES TO REBAR AND REMOVE MUD OFF REBAR AT INDICATED AREAS ... THE APPROVED NORTH,EAST AND WEST EXTERIOR PIERS |
3 |
|
3/6/2023 |
Leif Nelson |
Inspected |
COMPLETE SLAB POUR BACK DOWELS PER PLAN ... THEN APPROVED NORTHERN 1/3 SOG |
4 |
|
3/15/2023 |
Leif Nelson |
Inspected |
1. COMPLETE REMAINING SLAB BARS PER PLAN ... THEN APPROVED REMAINING SOG |
5 |
|
4/3/2023 |
Leif Nelson |
Inspected |
APPROVED FIRST INDICATED 14 TILT PANELS ... ALSO APPROVED TILT PANELS FOR 2 TRASH ENCLOSURES |
6 |
|
4/7/2023 |
Leif Nelson |
Inspected |
approved next 13 tilt panels |
7 |
|
4/10/2023 |
Leif Nelson |
Inspected |
1. COMPLETE SLAB DOWEL INSTALLS PER PLAN ... THEN APPROVED NEXT 7 PANELS |
8 |
|
4/12/2023 |
Leif Nelson |
Inspected |
APPROVED REMAINING PANELS |
9 |
|
4/14/2023 |
Leif Nelson |
Inspected |
APPROVED REMAINING STRIP AND PAD FTGS |
10 |
|
5/18/2023 |
Leif Nelson |
Inspected |
1. MAINTAIN MINIMUM 2" COVERAGE ON TOP BARS PER PLAN ... THEN APPROVED TRASH ENCLOSURE FTGS |
11 |
|
5/24/2023 |
Leif Nelson |
Inspected |
1. COMPLETE EPOXY DOWELS PER PLAN ... DO NOT POUR UNTIL REQD. 24 HR CURE TIME FOR EPOXY PER LISTING ...THEN OK TO POUR SOUTH AND EAST SIDES |
12 |
|
5/26/2023 |
Leif Nelson |
Inspected |
APPROVED REMAINING POUR BACK STRIP |