1 |
|
7/20/2021 |
Ron Parvin |
Inspected |
Hydro and cover completed. The only area that will need another cover inspection is in the sample room where there will be grid ceiling (2 heads). The heads are circled on the plans |
2 |
|
11/10/2021 |
Sarah Poet |
Corrections |
Need to inspect another day. The sprinkler contractor did not call in his permit so the test could not be conducted. Scott and Ed will coordinate with F/A contractor and call it back in. |
3 |
|
2/23/2022 |
Sarah Poet |
Approved |
Finished cover. plans marked
Tested system - Fire alarm didn't report so water flow will need to be re-tested when alarm is functional.
NFPA docs needed in TCE
Riser sign needed on exterior door.
Keysafe required. |