1 |
|
4/14/2021 |
Chad Cooper |
Inspected |
APPROVED PARAPET FRAMING FOR LOWER SECTION. |
2 |
|
5/20/2021 |
Chad Cooper |
Inspected |
PARTIAL FRAMING APPROVED FOR ELEC AND MECH ROOMS. |
3 |
|
7/9/2021 |
Chad Cooper |
Inspected |
APPROVED INTERIOR FRAMING ON NORTH SIDE. BREAK ROOM, MECH/ ELEC ROOMS, RESTROOMS, BOILER ROOM. |
4 |
|
8/9/2021 |
Roberto Rios |
Inspected |
INSPECTED FRAMING AT ROOMS 109/110 AND 111 |
5 |
|
10/14/2021 |
Chad Cooper |
Inspected |
PARTIAL-
APPROVED CEILING T-BAR. |
6 |
|
1/5/2022 |
Chad Cooper |
Approved |
APPROVED TO CLOSE FOLDER- CC 1/5/22 |