1 |
|
10/8/2020 |
Chad Cooper |
Corrections |
1. NOT READY 110.5
2. WANTED CONSULT ON DRAINAGE. |
2 |
|
10/21/2020 |
Matthew Smith |
Inspected |
FREEZER PADS |
3 |
|
11/12/2020 |
Matthew Smith |
Inspected |
2-G THRU A-6 ALONG PERIMETER INTERIOR FOOTINGS 6 LINE |
4 |
|
11/19/2020 |
Chad Cooper |
Inspected |
APPROVED STEM WALLS ON LINES A/7 THROUGH J/7
AND STEM WALLS ON LINES H AND J/1 THROUGH 7 |
5 |
|
11/23/2020 |
PAC Portal |
Cancel Inspection Request |
Cancelled by PACPORTAL ([email protected]) |
6 |
|
12/11/2020 |
Roberto Rios |
Inspected |
INSPECTED STEMWALL SECTION A5 TO D1 |
7 |
|
1/21/2021 |
Chad Cooper |
Inspected |
APPROVED FOOTINGS AND WALL ON E line 1-2 & 2 line E-F |
8 |
|
1/5/2022 |
Chad Cooper |
Approved |
APPROVED TO CLOSE FOLDER- CC 1/5/22 |