Development Permit Details
24 125389 00 CO
Permit- Number
- 24 125389 00 CO
- Type
- Commercial Permit - DS - Multi Family - New
- Status
- Permit Issued
- Details
- CO - VOYAGERS VILLAGE - 2210 COMMERCIAL STREET NE
- Description
- CIVIL SITE WORK FOR VOYAGERS VILLAGE - 41 UNIT APARTMENT COMPLEX
Person Details
TICOR TITLE
- Roles
- Paid By
- Address
-
315 COMMERCIAL ST SE 150
SALEM OR 97301
MICRONESIAN ISLANDER COMMUNITY
- Roles
- Responsible Utility Billing Contact, Owner
- Address
-
PO BOX 18606
SALEM OR 97305
KEN KINOSHITA
- Roles
- Contact
- Address
-
3223 NE 16TH AV
PORTLAND OR 97212
HUMBER DESIGN GROUP, INC.
- Roles
- Engineer
- Address
-
117 SE TAYLOR ST SUITE 001
PORTLAND OR 97214
DARYN MURPHY
- Roles
- Paid By
- Address
-
4835 NE 26TH AVE ST
PORTLAND OR 97211
STEVE KAROLYI
- Roles
- Applicant, Contact
- Address
-
516 SE MORRISON ST STE 800
PORTLAND OR 97214
GERDING BUILDERS LLC
- Roles
- Contractor
- Address
-
PO BOX 1082
CORVALLIS OR 97339
Property Details
Info
- In Urban Service Area?
- Yes
- County Name
- Marion
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- .87
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal regulations. Separate mechanical, electrical, plumbing, and fire systems permits are required for on-site/private utility installation (please contact Building & Safety at 503-588-6256). Any work performed within City of Salem public right-of-way requires a separate "Work in ROW" permit (please contact Ron Adkins or Van Tran at 503-588-6211). Work within Commercial Street NE right-of-way requires separate Oregon Department of Transportation (ODOT) permits.
- Water Service Level
- G0
- USGS Elevation
- 150
- PSI
- 79
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- No
- Domestic Water Meter Type
- Compound
- Domestic Water Service Line Size
- 4-inch
- Domestic Water Meter Size
- 3-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- City Permit
- Adjacent to Waterway/Wetlands?
- No
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- No
- Irrigation Water Meter Type
- Disk
- Driveway Req'd
- New
- Driveway Width
- 20
- Driveway Location
- ALLEY WIDENING
- Driveway #2 Req'd
- None
- Driveway Closure Req'd
- Yes
- Driveway Closure Width
- 15
- Driveway Closure Location
- Close existing driveway along Commercial Street NE
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- New
- Sidewalk Width
- 5
- Sidewalk Length
- 135
- Sidewalk Street Name
- GROVE STREET NE
- Sidewalk Location
- Property Line
- Sidewalk #2 Req'd?
- New
- Sidewalk #2 Width
- 5
- Sidewalk #2 Length
- 235
- Sidewalk #2 Street Name
- COMMERCIAL STREET NE - ODOT JURISDICTION
- Sidewalk #2 Location
- Property Line
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 20
- Storm Location
- 8-inch SD lateral. City forces to tap existing 42-inch public storm main in Grove Street NE. Contractor responsible for excavation, shoring, backfill, surface restoration and traffic control. GSI facilities on-site, see plans for details and locations.
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Order Quantity
- 1
- Storm Tap Type
- Main
- Storm Tap Size
- 8-inch
- Storm Main Size
- 42-inch
- Storm Main Pipe Material
- CO
- Sewer Tap Order Quantity
- 1
- Sewer Tap Type
- Main
- Sewer Tap Size
- 6-inch
- Sewer Main Size
- 8-inch
- Sewer Main Pipe Material
- PVC
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 10
- Sewer Location
- 6-inch SS lateral. City forces to tap existing 8-inch SS main in the alley. Contractor responsible for excavation, shoring, backfill, surface restoration and traffic control.
- Sewer Disconnect
- Individual - Abandonment
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- Number of Dwelling Units
- 41
- Commercial Vehicle Trips
- 153
- New Impervious Area (sq ft)
- 22768.8
Action Details
Agreements
-
Agreement
- Status:
- Open
- Assigned Staff:
- Matt Olney
-
PSFA
- Status:
- Info Requested
- Assigned Staff:
- Jason Valyou
- View Details
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Plan Review
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 4/14/2025
- Assigned Staff:
- Matt Olney
- View Details
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 4/14/2025
- Assigned Staff:
- PW Coordinator
- View Details
-
DS Landscape Review
- Status:
- Closed
- Completed Date:
- 4/14/2025
- Assigned Staff:
- Matt Olney
- View Details
Info
PW Environmental Services
-
Environmental Services Inspection
- Status:
- Open
- Assigned Staff:
- Environmental Services
Info
PW Finals
-
Final Field Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
Info
PW Inspections
-
Permanent Sewer Disconnect
- Status:
- Open
- Assigned Staff:
- PW Sewer
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 6/26/2025
- Assigned Staff:
- PW Sewer
- View Details
-
Storm Tap Installation
- Status:
- Completed by City
- Completed Date:
- 6/30/2025
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Storm Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Driveway Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Driveway Closure Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Sidewalk Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Erosion Control Inspection
- Status:
- Inspected
- Assigned Staff:
- PW Inspector
- View Details
-
ADA Ramps
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Stormwater Facility Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Stormwater Facility Landscaping Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Street Trees
- Status:
- Open
- Assigned Staff:
- PW Inspector
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 9/17/2025
- Assigned Staff:
- Greg Presser
- View Details
Info
PW Water Quality & Treatment Inspections
-
PW Backflow Device Inspection
- Status:
- Open
- Assigned Staff:
- Scott Ruyle
Info