Development Permit Details
24 121257 00 SF
Permit- Number
- 24 121257 00 SF
- Type
- Single Family - Single Family - New
- Status
- Permit Issued
- Details
- 5929 JOYNAK STREET S
- Description
- NDUP 3BED/3BATH Construct new attached duplex style townhome.
Person Details
HARRISON INDUSTRIES LLC
- Roles
- Contractor
- Address
-
10355 LIBERTY RD S
SALEM OR 97302-2508
BRIAN GRENZ
- Roles
- Applicant
- Address
-
1155 13TH ST SE
SALEM OR 97302-2508
Property Details
Info
- SDC's Bancrofted?
- No
- Temporary Access Fee
- Skyview Estates
- Jurisdiction
- Salem
- Illahe?
- No
- Pringle Creek Community / Fairview?
- No
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- No
- Domestic Water Meter Type
- Disk
- Domestic Water Meter Size
- 1-inch
- Domestic Water Service Line Size
- 1-inch
- Water Service Level
- S3
- USGS Elevation
- 570
- PSI
- 68
- Driveway Req'd
- Class 1 New
- Driveway Width
- 24
- Driveway Location
- JOYNAK ST
- Driveway #2 Req'd
- None
- Excavation/Fill Permit Req'd
- No
- Erosion Control Permit Req'd?
- City Permit
- Adjacent to Waterway/Wetlands?
- No
- Driveway Closure Req'd
- No
- Sidewalk Req'd?
- New
- ADA Ramp?
- No
- Sidewalk Width
- 5
- Sidewalk Length
- 25
- Sidewalk Street Name
- JOYNAK ST
- Sidewalk Location
- Property Line
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Storm Location
- Storm to curb
- Street Opening Required?
- No
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 44
- Sewer Location
- To pipe, north side, 10.59' from west PL, 7' deep, 44' long
- Sewer Tap Type
- None
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- NFIP Community Name & Community Number
- Salem, City of and 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- County Name
- Marion
Action Details
Plan Review
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 12/26/2024
- Assigned Staff:
- Jason Valyou
- View Details
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 12/26/2024
- Assigned Staff:
- PW Coordinator
- View Details
Info
PW Inspections
-
Final Public Works Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Sewer Inspection
- Status:
- Inspected
- Assigned Staff:
- PW Inspector
- View Details
-
Storm Inspection
- Status:
- Corrections
- Assigned Staff:
- PW Inspector
- View Details
-
Driveway Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Sidewalk Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Erosion Control Inspection
- Status:
- Inspected
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 2/24/2025
- Assigned Staff:
- Greg Presser
- View Details
Info