Land Use Action Details
24 120825 00 PLN
Submit Comment- Number
- 24 120825 00 PLN
- Type
- Planning - Type II - New
- Status
- In Review
- Case Number
- SPR-ADJ25-11
- Details
- 2110 STRONG RD SE
- Description
- Application Summary: Proposed new 8,000 square-foot retail building including a convenience store and second retail tenant lease space; together with associated off-street parking and site improvements. Request: A Class 3 Site Plan Review application for a proposed new 8,000 square-foot retail building, including a convenience store and second retail tenant lease space, and associated off-street parking and site improvements; together with a Class 2 Adjustment to the development standards of the Fairview Refinement Plan II refinement plan to: 1) Allow the minimum required floor-area-ratio (density/lot coverage) of the development to be less than 0.75 FAR. 2) Allow less than 70 percent of the lot frontage of the property abutting Strong Road SE and Lindburg Road SE to be occupied by buildings placed at the minimum setback line; 3) Allow the proposed building to exceed the maximum 20-foot side street setback abutting the private internal street - Village Center Loop; and 4) Allow the off-street parking area to the south and west of the proposed building and the off-street loading space to the south of the building to be setback less than the minimum required 20-foot setback abutting the private internal street - Village Center Loop. The subject property is approximately 1.08 acres in size, zoned FMU (Fairview Mixed-Use) within the Fairview Refinement Plan II refinement plan, and located at 2110 Strong Road SE (Marion County Assessor Map and Tax Lot Number: 083W11AB03200).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
Mailing List | XLS - Excel Spreadsheet | 17 KB | View/Download |
App and NA List | XLS - Excel Spreadsheet | 10 KB | View/Download |
Notice Email with BCC | PDF - Adobe | 117 KB | View/Download |
Notice Affidavit | PDF - Adobe | 57 KB | View/Download |
Copy Center Notice Email | PDF - Adobe | 107 KB | View/Download |
Notice of Filing | PDF - Adobe | 10 MB | View/Download |
Vicinity Map | PDF - Adobe | 444 KB | View/Download |
Fairview 3-28-25 Rendering | PDF - Adobe | 9 MB | View/Download |
Fairview Retail Drawings 3-28-25 | PDF - Adobe | 815 KB | View/Download |
29139_Sustainable Fairview Trip Tracking_final_Dec 2024_signed | PDF - Adobe | 5 MB | View/Download |
Original Application Applicant's Response | PDF - Adobe | 628 KB | View/Download |
Original Application Applicant's Response | PDF - Adobe | 6 MB | View/Download |
Original Application Applicant's Response | PDF - Adobe | 12 MB | View/Download |
Original Application Applicant's Response | PDF - Adobe | 26 MB | View/Download |
Original Application Planner's Incomplete | PDF - Adobe | 127 KB | View/Download |
Original Application Planner's Incomplete | PDF - Adobe | 17 MB | View/Download |
Original Application | PDF - Adobe | 234 KB | View/Download |
Original Application | PDF - Adobe | 96 KB | View/Download |
Original Application | PDF - Adobe | 94 KB | View/Download |
Original Application | PDF - Adobe | 749 KB | View/Download |
Original Application | PDF - Adobe | 5 MB | View/Download |
Original Application | PDF - Adobe | 749 KB | View/Download |
Original Application | PDF - Adobe | 17 MB | View/Download |
Original Application | PDF - Adobe | 372 KB | View/Download |
Original Application | PDF - Adobe | 1 MB | View/Download |
Original Application | PDF - Adobe | 93 KB | View/Download |
Original Application | PDF - Adobe | 97 KB | View/Download |
Original Application | PDF - Adobe | 87 KB | View/Download |
Property Details
Info
- Application Type II
- Class 2 Adjustment,Class 3 Site Plan Review
- MS4 Reporting
- Yes
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 4/16/2025
- Assigned Staff:
- Laurel Christian
- View Details
-
PW Memo
- Status:
- Open
- Assigned Staff:
- Laurel Christian
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Bryce Bishop
-
Building and Safety Comments
- Status:
- Complete
- Completed Date:
- 4/10/2025
- Assigned Staff:
- Al Rossi
- View Details
-
Fire Comments
- Status:
- Open
- Assigned Staff:
- Fire Marshal
-
Decision
- Status:
- Open
- Assigned Staff:
- Bryce Bishop
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 10/7/2024
- Assigned Staff:
- Planning Administrator
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 4/9/2025
- Assigned Staff:
- Bryce Bishop
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 4/9/2025
- Assigned Staff:
- Bryce Bishop
- View Details
Info