Development Permit Details
24 103724 00 SF
- Number
- 24 103724 00 SF
- Type
- Single Family - Triplex/Quadplex - New
- Status
- Completed
- Details
- 2605 LAUREL AVENUE NE
- Description
- N34 12BED/12BATH New wood framed 2 story fourplex construction.
Person Details
RON JACKSON
- Roles
- Applicant
- Address
-
3150 KETTLE CT SE
SALEM OR 97301
Property Details
Info
- SDC's Bancrofted?
- No
- Temporary Access Fee
- Not Applicable
- Jurisdiction
- Salem
- Illahe?
- No
- Pringle Creek Community / Fairview?
- No
- Install Domestic Water Meter?
- Upgrade
- Install Domestic Water Service Line
- No
- Domestic Water Meter Type
- Disk
- Domestic Water Meter Size
- 1.5-inch
- Domestic Water Service Line Size
- 2-inch
- Water Service Level
- G0
- USGS Elevation
- 156
- PSI
- 77
- Driveway Req'd
- Repair
- Driveway Width
- 22
- Driveway Location
- LAUREL AV
- Driveway #2 Req'd
- None
- Excavation/Fill Permit Req'd
- No
- Erosion Control Permit Req'd?
- City Permit
- Adjacent to Waterway/Wetlands?
- No
- Driveway Closure Req'd
- Yes
- Driveway Closure Location
- Laurel Ave near NE property corner
- Sidewalk Req'd?
- New
- ADA Ramp?
- New/Replaced - City Design
- Sidewalk Width
- 5
- Sidewalk Length
- 75
- Sidewalk Street Name
- LAUREL AV
- Sidewalk Location
- Property Line
- Sidewalk #2 Req'd?
- New
- Sidewalk #2 Width
- 5
- Sidewalk #2 Length
- 120
- Sidewalk #2 Street Name
- Hickory St NE
- Sidewalk #2 Location
- Property Line
- Lane Closure Required
- Local, ROW, Lane, or Alley
- Storm?
- Connect
- Storm Location
- Storm to Curb
- Street Opening Required?
- No
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 10
- Sewer Location
- To existing sewer lateral.
- Sewer Tap Type
- None
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- NFIP Community Name & Community Number
- Salem, City of and 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- County Name
- Marion
Action Details
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 10/29/2024
- Assigned Staff:
- PW Coordinator
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 10/29/2024
- Assigned Staff:
- Zach Diehl
- View Details
Info
PW Inspections
-
Final Public Works Inspection
- Status:
- Approved
- Completed Date:
- 4/29/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Storm Inspection
- Status:
- Approved
- Completed Date:
- 4/29/2025
- Assigned Staff:
- Tracy Roe
- View Details
-
Driveway Inspection
- Status:
- Approved
- Completed Date:
- 4/29/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Driveway Closure Inspection
- Status:
- Approved
- Completed Date:
- 3/5/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Sidewalk Inspection
- Status:
- Approved
- Completed Date:
- 4/29/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Street Trees
- Status:
- Approved
- Completed Date:
- 4/29/2025
- Assigned Staff:
- Tracy Roe
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 4/29/2025
- Assigned Staff:
- Tracy Roe
- View Details
-
ADA Ramps
- Status:
- Closed
- Completed Date:
- 4/29/2025
- Assigned Staff:
- Tracy Roe
- View Details
-
Initial Sewer Inspection
- Status:
- Approved
- Completed Date:
- 4/23/2025
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 2/25/2025
- Assigned Staff:
- Greg Presser
- View Details
-
Water Tap Installation
- Status:
- Completed by City
- Completed Date:
- 2/25/2025
- Assigned Staff:
- Devin Newstrand
- View Details
Info