Development Permit Details
23 115856 00 CO
- Number
- 23 115856 00 CO
- Type
- Commercial Permit - DS - Commercial - New
- Status
- Completed
- Details
- CO - IEC BUILDING - 3575 DEL WEBB AVENUE NE
- Description
- CIVIL SITE WORK FOR A NEW POST SECONDARY EDUCATION FACILITY
Person Details
BLAKE BURAL
- Roles
- Paid By, Applicant, Contact, Designer
- Address
-
1100 Liberty Street SE
SALEM OR 97302
JEFFREY HOOPER
- Roles
- Paid By, Responsible Utility Billing Contact
- Organization
- MERIT SHOP HOLDINGS, LLC
- Address
-
11481 SW HALL BV
TIGARD OR 97223
WILLIAM HORSEY
- Roles
- Interested Party
- Address
-
2455 RIVER RD S
SALEM OR 97302-5819
CINDY REGIER
- Roles
- Contact, Paid By
- Address
-
11481 SW HALL BV STE 100
TIGARD OR 97223
WHITE OAK DEVELOPMENT AND CONSTRUCTION CO
- Roles
- Contractor
- Address
-
2455 RIVER RD S
SALEM OR 97302-5819
AC AND CO ARCHITECTURE COMMUNITY
- Roles
- Architect
- Address
-
1100 LIBERTY ST SE STE 200
SALEM OR 97302
WESTECH ENGINEERING INC
- Roles
- Engineer
- Address
-
3841 FAIRVIEW INDUSTRIAL DR SE SUITE 100
SALEM OR 97302-1192
Property Details
Info
- Agreement Req'd
- PSFA
- Jurisdiction
- Salem
- Special Conditions
- N/A
- In Urban Service Area?
- Yes
- County Name
- Marion
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- 2
- Water Service Level
- G0
- USGS Elevation
- 140
- PSI
- 84
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- New
- Domestic Water Meter Type
- Disk
- Domestic Water Service Line Size
- 2-inch
- Domestic Water Meter Size
- 1-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- 1200-C
- Copy of DEQ Permit Submitted?
- Yes
- Adjacent to Waterway/Wetlands?
- No
- Excavation/Fill Permit Req'd
- No
- Excavation Quantity (CY)
- 0
- Fill Quantity (CY)
- 0
- Install Irrigation Water Meter?
- No
- Install Irrigation Water Service Line
- No
- Irrigation Water Meter Type
- Disk
- Driveway Req'd
- None
- Driveway Location
- DEL WEBB AV
- Driveway #2 Req'd
- None
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- None
- Sidewalk Width
- 5
- Sidewalk Street Name
- DEL WEBB AV
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 10
- Storm Location
- New private MH installation and private storm connection with discharge to existing GSI facility.
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Order Quantity
- 0
- Storm Tap Type
- None
- Sewer Tap Order Quantity
- 1
- Sewer Tap Type
- Main
- Sewer Tap Size
- 6-inch
- Sewer Main Size
- 8-inch
- Sewer Main Pipe Material
- CO
- Sewer Tap #2 Order Quantity
- 1
- Sewer Tap #2 Type
- Main
- Sewer Tap #2 Size
- 6-inch
- Sewer Main #2 Size
- 8-inch
- Sewer Main #2 Pipe Material
- CO
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 10
- Sewer Location
- New 6-inch SS service lateral, 9-feet terminating with SSCO. Includes installation of a monitoring manhole.
- Sewer Disconnect
- None
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- Commercial Vehicle Trips
- 212
- New Impervious Area (sq ft)
- 70418.50
Action Details
Agreements
-
Agreement
- Status:
- Approved
- Completed Date:
- 8/30/2024
- Assigned Staff:
- Tiffany Russell
- View Details
-
PSFA
- Status:
- Approved
- Completed Date:
- 8/23/2023
- Assigned Staff:
- Jason Valyou
- View Details
Info
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Approved
- Completed Date:
- 8/30/2024
- Assigned Staff:
- PW Coordinator
- View Details
Info
Inspections-Planning
-
Protected Tree Inspection
- Status:
- Finaled
- Completed Date:
- 12/18/2023
- Assigned Staff:
- Michael Conkey
- View Details
Info
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 12/4/2023
- Assigned Staff:
- Robin Dalke
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 10/11/2023
- Assigned Staff:
- Robin Dalke
- View Details
Info
PW Environmental Services
-
Environmental Services Inspection
- Status:
- Approved
- Completed Date:
- 8/2/2024
- Assigned Staff:
- Environmental Services
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Approved
- Completed Date:
- 6/10/2024
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Inspections
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 2/1/2024
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 2/1/2024
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Inspection
- Status:
- Approved
- Completed Date:
- 4/19/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Storm Inspection
- Status:
- Approved
- Completed Date:
- 4/19/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 6/10/2024
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 2/9/2024
- Assigned Staff:
- PW Water Group
- View Details
-
Water Tap Installation
- Status:
- Completed by City
- Completed Date:
- 8/1/2024
- Assigned Staff:
- PW Water Group
- View Details
Info
PW Water Quality & Treatment Inspections
-
PW Backflow Device Inspection
- Status:
- Approved
- Completed Date:
- 8/13/2024
- Assigned Staff:
- Scott Ruyle
- View Details
Info