Land Use Action Details
23 103081 00 PLN
- Number
- 23 103081 00 PLN
- Type
- Planning - Type II - New
- Status
- Completed - Approved
- Case Number
- SPR-ADJ-DAP23-06
- Details
- 155 COTTAGE STREET NE
- Description
- Summary: A Class 3 Site Plan Review with two Class 2 Adjustments and one Class 2 Driveway Approach Permit for renovations at the Oregon State Executive Building. Request: A Class 3 Site Plan Review for renovations at the Oregon State Executive Building including one Class 2 Driveway Approach Permit to widen the access to an existing loading and solid waste service area, and two Class 2 Adjustments to: 1.) Reduce the required minimum spacing requirement of 370 feet between the driveway approach proposed for reconstruction and the adjacent intersections of Cottage St NE and Church St NE, per SRC 804.035(d). 2.) Allow parallel access instead of perpendicular access to a solid waste service area of more than four cubic yards, per SRC 800.055(f)(1)(A) The subject property is 2.65 acres in size, zoned PS (Public Services) and located at 155 Cottage St NE (Marion County Assessor's Map and Tax Lot Number 073W27AA / 2300).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
NOD Affidavit | PDF - Adobe | 422 KB | View/Download |
NOF Affidavit | PDF - Adobe | 422 KB | View/Download |
Copy Center Decision Email | PDF - Adobe | 91 KB | View/Download |
Decision Email with BCC | PDF - Adobe | 101 KB | View/Download |
Decision (Planning Administrator) | PDF - Adobe | 3 MB | View/Download |
Applicant / NA / Contact List | XLS - Excel Spreadsheet | 10 KB | View/Download |
Physical Mailing List | XLS - Excel Spreadsheet | 11 KB | View/Download |
Notice Notification Map and Emails | PDF - Adobe | 266 KB | View/Download |
Notice of Filing / Request for Comments | PDF - Adobe | 3 MB | View/Download |
72-Planting-Plan-REV02 | PDF - Adobe | 945 KB | View/Download |
82-Waste-Access-Response | PDF - Adobe | 2 MB | View/Download |
80-Neighborhood-Association-Contact | PDF - Adobe | 747 KB | View/Download |
81-Transit-Authority-Contact | PDF - Adobe | 149 KB | View/Download |
76-Trip-Generation-Estimate-Form | PDF - Adobe | 480 KB | View/Download |
75-Fire-Flow-Test | PDF - Adobe | 208 KB | View/Download |
74-Geotechnical-Report | PDF - Adobe | 3 MB | View/Download |
73-Tree-Inventory | PDF - Adobe | 168 KB | View/Download |
71-Grading-Plan-REV02 | PDF - Adobe | 723 KB | View/Download |
63-Existing-Survey-L2 | PDF - Adobe | 11 MB | View/Download |
70-Tree-Removal-Preservation-Plan | PDF - Adobe | 552 KB | View/Download |
62-Existing-Survey-L1 | PDF - Adobe | 8 MB | View/Download |
69-Driveway-Approach-Plan-REV02 | PDF - Adobe | 1 MB | View/Download |
68-Utility-Plan-REV02 | PDF - Adobe | 1 MB | View/Download |
67-Existing-Conditions-Plan | PDF - Adobe | 1 MB | View/Download |
66-Site-Development-Plan-L2-REV02 | PDF - Adobe | 717 KB | View/Download |
65-Site-Development-Plan-L1-REV02 | PDF - Adobe | 207 KB | View/Download |
64-Site-Context-Circulation-REV02 | PDF - Adobe | 1 MB | View/Download |
61-Site-Context | PDF - Adobe | 7 MB | View/Download |
60-General-Information | PDF - Adobe | 1 MB | View/Download |
53-Narrative-REV02 | PDF - Adobe | 503 KB | View/Download |
52-PreApplication-Memo | PDF - Adobe | 389 KB | View/Download |
51-Deed-Title | PDF - Adobe | 2 MB | View/Download |
Incomplete-Letter-Responses-02-03-23 | PDF - Adobe | 893 KB | View/Download |
Land Use_23 103081 00 PLN | PDF - Adobe | 85 KB | View/Download |
Property Details
Info
- Application Type II
- Class 3 Site Plan Review,Class 2 Adjustment,Class 2 Driveway Approach Permit
- Type of Plan Check
- Commercial/Industrial
- MS4 Reporting
- Yes
- Total Project Valuation
- 45000000
- Site Area (Acreage)
- 2.65
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 3/10/2023
- Assigned Staff:
- Laurel Christian
- View Details
-
PW Memo
- Status:
- Complete
- Completed Date:
- 3/10/2023
- Assigned Staff:
- Laurel Christian
- View Details
-
PW Final Report
- Status:
- Complete
- Completed Date:
- 3/10/2023
- Assigned Staff:
- Laurel Christian
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Peter Domine
-
Building and Safety Comments
- Status:
- Complete
- Completed Date:
- 3/7/2023
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Complete
- Completed Date:
- 3/13/2023
- Assigned Staff:
- Fire Marshal
- View Details
-
Decision
- Status:
- Approved
- Completed Date:
- 3/24/2023
- Assigned Staff:
- Peter Domine
- View Details
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 4/14/2023
- Assigned Staff:
- Peter Domine
- View Details
-
Courtesy Expiration Letter
- Status:
- Complete
- Completed Date:
- 10/29/2024
- Assigned Staff:
- Peter Domine
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 2/7/2023
- Assigned Staff:
- Peter Domine
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 2/28/2023
- Assigned Staff:
- Peter Domine
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 3/2/2023
- Assigned Staff:
- Peter Domine
- View Details
Info