Development Permit Details
22 122322 00 CO
- Number
- 22 122322 00 CO
- Type
- Commercial Permit - DS - Commercial - New
- Status
- Completed
- Details
- CO - FRED MEYER FUEL CENTER - 2980 RIVER ROAD N
- Description
- CIVIL SITE WORK for construction of 6,900 SF canopy including installation of 7 fuel dispensers, two (2) 20,000 gallon underground storage tanks, propane tank merchandising display, 172 SF Cashier's Kiosk and associated site improvements including landscape, site lighting and parking striping. **REVISED 12/20/2023 TO INCLUDE DOMESTIC AND IRRIGATION SERVICES/METERS
Person Details
BARGHAUSEN CONSULTING ENGINEERS
- Roles
- Applicant, Designer, Engineer
- Address
-
18215 72ND AV S
KENT WA 98032-1006
CHARLES MOSELEY
- Roles
- Contact, Paid By
- Address
-
18215 72ND AV S
KENT WA 98032
DANIELLE HOBERT
- Roles
- Contact, Paid By
- Address
-
23421 SOUTH POINTE DR
LAGUNA HILLS CA 92653
MENG HANNAN CONSTRUCTION CO INC
- Roles
- Contractor, Paid By
- Address
-
9301 SW STANLEY AVE
PORTLAND OR 97222-4236
MATT FAILOR
- Roles
- Contact
- Address
-
9301 SE STANLEY AV
PORTLAND OR 97222
MJC INVESTMENT PROPERTY XII LLC
- Roles
- Responsible Utility Billing Contact
- Address
-
23421 SOUTH POINTE DR STE 270
LAGUNA HILLS CA 92653
Property Details
Info
- Agreement Req'd
- Other
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal Regulations. Private Plumbing Permits are required for all on-site utility installation (Please contact Building & Safety at 503-588-6256). Any work performed within City of Salem public right-of-way requires a separate "Work in ROW" permit (Please contact Ron Adkins or Van Tran at 503-588-6211).
- In Urban Service Area?
- Yes
- County Name
- Marion
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- .91
- Water Service Level
- G0
- USGS Elevation
- 140
- PSI
- 84
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- New
- Domestic Water Meter Type
- Disk
- Domestic Water Service Line Size
- 1-inch
- Domestic Water Meter Size
- 3/4-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- City Permit
- Adjacent to Waterway/Wetlands?
- No
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- Yes
- Install Irrigation Water Service Line
- Yes
- Irrigation Water Meter Type
- Disk
- Water Service Line Size - Irrigation
- 1-inch
- Irrigation Water Meter Size
- 3/4-inch
- Driveway Req'd
- New
- Driveway Width
- 36
- Driveway Location
- RIVER RD - replace existing driveway north of project site - see plans
- Driveway #2 Req'd
- New
- Driveway #2 Width
- 36
- Driveway #2 Location
- RIVER RD - replace existing driveway south of project site - see plans
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- New
- Sidewalk Width
- 5
- Sidewalk Length
- 30
- Sidewalk Street Name
- RIVER RD - replace existing curb ramps and/or construct new per plans
- Sidewalk Location
- Curb Line
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 10
- Storm Location
- City to tap existing MH south of project site. GSI facilities on-site, see plans for details and location
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Order Quantity
- 1
- Storm Tap Type
- Manhole
- Storm Tap Size
- 12-inch
- Storm Main Size
- Manhole
- Sewer Tap Order Quantity
- 1
- Sewer Tap Type
- Main
- Sewer Tap Size
- 6-inch
- Sewer Main Size
- 8-inch
- Sewer Main Pipe Material
- PVC
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 35
- Sewer Location
- City forces to tap existing 8-inch SS main in River Road N for 6-inch service - see plans for location
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- Commercial Vehicle Trips
- 130
- New Impervious Area (sq ft)
- 0
Action Details
Agreements
-
PSFA
- Status:
- Approved
- Completed Date:
- 2/16/2024
- Assigned Staff:
- Jason Valyou
- View Details
Info
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Approved
- Completed Date:
- 2/16/2024
- Assigned Staff:
- Matt Olney
- View Details
Info
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 7/26/2023
- Assigned Staff:
- PW Coordinator
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 7/26/2023
- Assigned Staff:
- Matt Olney
- View Details
Info
PW Environmental Services
-
Environmental Services Inspection
- Status:
- Approved
- Completed Date:
- 12/28/2023
- Assigned Staff:
- Environmental Services
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Approved
- Completed Date:
- 1/22/2024
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Inspections
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 10/10/2023
- Assigned Staff:
- PW Sewer
- View Details
-
Storm Tap Installation
- Status:
- Completed by Applicant (No Refund Due)
- Completed Date:
- 12/20/2023
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer Inspection
- Status:
- Approved
- Completed Date:
- 12/5/2023
- Assigned Staff:
- PW Inspector
- View Details
-
Storm Inspection
- Status:
- Approved
- Completed Date:
- 1/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
Driveway Inspection
- Status:
- Approved
- Completed Date:
- 12/20/2023
- Assigned Staff:
- PW Inspector
- View Details
-
Sidewalk Inspection
- Status:
- Approved
- Completed Date:
- 12/20/2023
- Assigned Staff:
- PW Inspector
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 1/22/2024
- Assigned Staff:
- PW Inspector
- View Details
-
ADA Ramps
- Status:
- Approved
- Completed Date:
- 12/5/2023
- Assigned Staff:
- PW Inspector
- View Details
-
Street Trees
- Status:
- Approved
- Completed Date:
- 1/18/2024
- Assigned Staff:
- PW Inspector
- View Details
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 12/27/2023
- Assigned Staff:
- Greg Presser
- View Details
-
Meter Installation - Irrigation
- Status:
- Complete
- Completed Date:
- 1/22/2024
- Assigned Staff:
- Greg Presser
- View Details
-
Water Tap Installation
- Status:
- Completed by City
- Completed Date:
- 12/29/2023
- Assigned Staff:
- Devin Newstrand
- View Details
-
Water Tap Installation
- Status:
- Completed by City
- Completed Date:
- 12/29/2023
- Assigned Staff:
- Devin Newstrand
- View Details
Info