Development Permit Details
22 117466 00 CO
Permit- Number
- 22 117466 00 CO
- Type
- Commercial Permit - DS - Mixed Use - New
- Status
- Permit Issued
- Details
- CO - ANTHONY'S PLACE APARTMENTS - 5775 COMMERCIAL STREET SE
- Description
- CIVIL SITE WORK TO CONSTRUCT ON-SITE UTILITIES, WATER, SEWER AND DRAINAGE FOR NEW APARTMENT COMPLEX
Person Details
WILTSEY III ANTHONYS CORNER LLC
- Roles
- Applicant
- Address
-
5775 COMMERCIAL ST SE
SALEM OR 97306
BO RUSHING
- Roles
- Contact, Paid By
- Address
-
1252 23RD ST SE STE 120
SALEM OR 97302
MARK GRENZ
- Roles
- Contact
- Address
-
1155 13TH ST SE 11
SALEM OR 97302-2508
BRIAN GRENZ
- Roles
- Contact
- Address
-
1155 13TH ST SE
SALEM OR 97302-2508
MULTI CONSTRUCTION INC
- Roles
- Contractor, Paid By
- Address
-
1252 23RD ST SE SUITE 120
SALEM OR 97302
MULTI TECH ENGINEERING SERVICES INC
- Roles
- Designer, Engineer
- Address
-
1155 13TH ST SE
SALEM OR 97302-2508
RUSHING COMMERCIAL CROSSING LLC
- Roles
- Owner, Responsible Utility Billing Contact
- Address
-
1252 23RD ST SE STE 120
SALEM OR 97302
Property Details
Info
- In Urban Service Area?
- Yes
- County Name
- Marion
- Subject to SDF?
- Yes
- Permits Required?
- Yes
- Proposed Developed Area
- 1.39
- Jurisdiction
- Salem
- Special Conditions
- Contractor to follow all State and Federal Regulations. Private Plumbing Permits are required for all on-site utility installation (Please contact Building & Safety at 503-588-6256). Any work performed within City of Salem public right-of-way requires a separate "Work in ROW" permit (Please contact Ron Adkins or Van Tran at 503-588-6211).
- Water Service Level
- S2
- USGS Elevation
- 390
- PSI
- 90
- Install Domestic Water Meter?
- New
- Install Domestic Water Service Line
- No
- Domestic Water Meter Type
- Compound
- Domestic Water Service Line Size
- 4
- Domestic Water Meter Size
- 3-inch
- Geo Review Req'd?
- No
- Erosion Control Permit Req'd?
- 1200-C
- Copy of DEQ Permit Submitted?
- Yes
- Adjacent to Waterway/Wetlands?
- Yes
- Excavation/Fill Permit Req'd
- No
- Install Irrigation Water Meter?
- No
- Install Irrigation Water Service Line
- No
- Irrigation Water Meter Type
- Disk
- Driveway Req'd
- None
- Driveway Location
- COMMERCIAL ST
- Driveway #2 Req'd
- None
- Driveway Closure Req'd
- No
- Driveway #2 Closure Req'd
- No
- Sidewalk Req'd?
- None
- Sidewalk Width
- 5
- Sidewalk Street Name
- COMMERCIAL ST
- Sidewalk #2 Req'd?
- None
- Lane Closure Required
- None
- Storm?
- Connect
- Length of Storm Pipe
- 10
- Storm Location
- Outlet to Waln Creek - GSI facilities (mechanical) on-site. See plans for details and location.
- Storm Disconnect
- No
- Street Opening Required?
- No
- Storm Tap Type
- None
- Sewer Tap Order Quantity
- 1
- Sewer Tap Type
- Manhole
- Sewer Tap Size
- 8
- Sewer Main Pipe Material
- PVC
- Sewer?
- Connection - Inside City
- Length of Sewer Pipe
- 5
- Sewer Location
- 8-inch SS tap on existing public MH located on-site. See plans for location and details.
- Is Floodplain Development Required?
- N/A
- Elevation Certificate Req'd?
- No
- Latitude/Longitude
- Null
- Horizontal Datum
- NAD 1927
- NFIP Community Name & Community Number
- Salem, City of & 410167
- State
- Oregon
- Firm Index Date
- 1/2/2003
- Base Flood Elevation Source
- FIRM
- Elevation Datum
- NGVD 1929
- Is this CBRS or OPA?
- No
- ROW Dedication Req'd?
- No
- Number of Dwelling Units
- 71
- Commercial Vehicle Trips
- 423
- New Impervious Area (sq ft)
- 52735
Action Details
Agreements
-
Agreement
- Status:
- Approved
- Completed Date:
- 4/10/2024
- Assigned Staff:
- Tiffany Russell
- View Details
-
PSFA
- Status:
- Approved
- Completed Date:
- 4/10/2024
- Assigned Staff:
- Jason Valyou
- View Details
Info
Application Intake
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Final B&S Inspections
-
Regulatory Final
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Inspections-Planning
-
Protected Tree Inspection
- Status:
- Finaled
- Completed Date:
- 10/12/2023
- Assigned Staff:
- Michael Conkey
- View Details
Info
Plan Review
-
PW Make Ready To Issue
- Status:
- Ready to Issue
- Completed Date:
- 10/6/2023
- Assigned Staff:
- PW Coordinator
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 10/6/2023
- Assigned Staff:
- Matt Olney
- View Details
Info
PW Environmental Services
-
Environmental Services Inspection
- Status:
- Inspected
- Assigned Staff:
- Environmental Services
- View Details
Info
PW Finals
-
Final Field Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
Info
PW Inspections
-
Sewer Tap Installation
- Status:
- Completed by City
- Completed Date:
- 8/1/2024
- Assigned Staff:
- PW Sewer
- View Details
-
Sewer/Storm Cross-Connect Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Sewer Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Storm Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Erosion Control Inspection
- Status:
- Inspected
- Assigned Staff:
- PW Inspector
- View Details
-
Stormwater Facility Inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Street Trees
- Status:
- Open
- Assigned Staff:
- PW Inspector
Info
PW Water Inspections
-
Meter Installation
- Status:
- Complete
- Completed Date:
- 8/2/2024
- Assigned Staff:
- Devin Newstrand
- View Details
-
Meter Installation
- Status:
- Open
- Assigned Staff:
- Greg Presser
Info
PW Water Quality & Treatment Inspections
-
PW Backflow Device Inspection
- Status:
- Open
- Assigned Staff:
- Scott Ruyle
Info