Land Use Action Details
22 116522 00 PLN
- Number
- 22 116522 00 PLN
- Type
- Planning - Type II - New
- Status
- Completed - Approved
- Case Number
- SPR-ADJ-TRV-DAP-DR-TRP22-44
- Details
- 5205 BATTLE CREEK RD SE
- Description
- Application Summary: Proposed 129-unit multiple family residential development with associated off-street parking, common open space, and site improvements. Request: A consolidated application for a proposed 129-unit multiple family residential development with associated off-street parking, common open space, and site improvements on a portion of property totaling approximately 4.66 acres in size. The application includes: 1) A Class 3 Site Plan Review for the proposed development; 2) A Class 1 Design Review to determine the proposed developments conformance with the applicable multiple family design review standards of SRC 702.020; 3) A Class 2 Adjustment to: a) Allow less than 40 percent of the buildable width of the street frontage of Lot 3 along Teal Street and less than 40 percent of the buildable width of the street frontage of Lot 4 along Salal Street to be occupied by buildings placed at the setback line (SRC 702.020(e)(4)); b) Allow two ground floor dwelling units in building I.3 and one ground floor dwelling unit in building H.2 that are located within 25 feet of a property line abutting a street to not have a primary entrance facing the street with direct pedestrian access to the adjacent sidewalk (SRC 702.020(e)(5)); c) Allow portions of the upper floor facades of buildings I.1, I.2, I.3, H.1, and H.2 to exceed a maximum length 80 ft. without an articulating faade design element a minimum of four feet in depth (SRC 702.020(e)(9)); d) Allow the vehicle operation area for solid waste collection service vehicles serving receptacles greater than two cubic yards in size to be located parallel, rather than perpendicular, to the front opening of the trash enclosure (SRC 800.055(f)(1)(A)); and e) Allow the vehicle operation area for solid waste collection service vehicles to be designed without a turnaround, thereby requiring the vehicles to back onto the street (SRC 800.055(f)(2)); 4) A Class 2 Driveway Approach Permit for the proposed driveway approaches serving the development onto Salal Street SE; 5) A Tree Variance to allow the removal of 18 significant trees on Lot 3 to accommodate the proposed development; and 6) A Tree Removal Permit to allow the removal of one significant tree on Lot 4 to accommodate the proposed development. The subject property is zoned RM-II (Multiple Family Residential) and located at 5205 Battle Creek Road SE (Marion County Assessor Map and Tax Lot Number: 083W140000300).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
Parking Changes related to Condition of Approval | PDF - Adobe | 925 KB | View/Download |
NOD Affidavit | PDF - Adobe | 202 KB | View/Download |
NOF Affidavit | PDF - Adobe | 683 KB | View/Download |
ODAV Aeronautical Determination Letter | PDF - Adobe | 54 KB | View/Download |
DSL WLUN Response | PDF - Adobe | 665 KB | View/Download |
Decision (Planning Administrator) | PDF - Adobe | 23 MB | View/Download |
115 - Public Works Memo | PDF - Adobe | 184 KB | View/Download |
Comments Submitted Public (PA) | PDF - Adobe | 360 KB | View/Download |
Comments Submitted Agencies (PA) | PDF - Adobe | 1 MB | View/Download |
Public Comment Response | PDF - Adobe | 212 KB | View/Download |
WLUN Letter | PDF - Adobe | 20 MB | View/Download |
Notice of Filing | PDF - Adobe | 19 MB | View/Download |
Vicinity Map | PDF - Adobe | 259 KB | View/Download |
Landscape Drawings REV2 | PDF - Adobe | 25 MB | View/Download |
2nd completeness response memo | PDF - Adobe | 1 MB | View/Download |
Republic Services letter REV1 | PDF - Adobe | 135 KB | View/Download |
Arborist Report Tree Data Table | PDF - Adobe | 1 MB | View/Download |
Arborist Report | PDF - Adobe | 1 MB | View/Download |
Supplemental Findings | PDF - Adobe | 662 KB | View/Download |
Planting Plans | PDF - Adobe | 5 MB | View/Download |
Project Consent Resolution | PDF - Adobe | 302 KB | View/Download |
TGE Form | PDF - Adobe | 1 MB | View/Download |
Warranty Deed | PDF - Adobe | 213 KB | View/Download |
Landscape Drawings REV1 | PDF - Adobe | 16 MB | View/Download |
Completeness Response | PDF - Adobe | 244 KB | View/Download |
Completeness Review | PDF - Adobe | 12 MB | View/Download |
PDF - Adobe | 101 MB | View/Download | |
Geotechnical Report | PDF - Adobe | 14 MB | View/Download |
Pre-App Report | PDF - Adobe | 15 MB | View/Download |
Neighborhood Association Contact | PDF - Adobe | 144 KB | View/Download |
Stormwater Report | PDF - Adobe | 9 MB | View/Download |
Service Provider Letters | PDF - Adobe | 538 KB | View/Download |
Transportation Impact Analysis | PDF - Adobe | 4 MB | View/Download |
Architectural Dwgs Bldg I | PDF - Adobe | 22 MB | View/Download |
Architectural Dwgs Bldg H | PDF - Adobe | 21 MB | View/Download |
Architectural Dwgs Bldg G2 | PDF - Adobe | 34 MB | View/Download |
Architectural Dwgs Bldg G1 | PDF - Adobe | 22 MB | View/Download |
Civil Drawings | PDF - Adobe | 29 MB | View/Download |
Landscape Drawings | PDF - Adobe | 21 MB | View/Download |
Written Statement | PDF - Adobe | 4 MB | View/Download |
Application | PDF - Adobe | 305 KB | View/Download |
Property Details
Info
- Application Type II
- Class 1 Design Review,Class 2 Driveway Approach Permit,Class 3 Site Plan Review,Class 2 Adjustment,Tree Variance,Tree and Vegetation Removal Permit
- MS4 Reporting
- Yes
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 11/17/2022
- Assigned Staff:
- Laurel Christian
- View Details
-
PW Memo
- Status:
- Complete
- Completed Date:
- 11/23/2022
- Assigned Staff:
- Laurel Christian
- View Details
-
PW Final Report
- Status:
- Complete
- Completed Date:
- 11/23/2022
- Assigned Staff:
- Laurel Christian
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Bryce Bishop
-
Building and Safety Comments
- Status:
- Complete
- Completed Date:
- 10/26/2022
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Complete
- Completed Date:
- 4/7/2023
- Assigned Staff:
- Fire Marshal
- View Details
-
Decision
- Status:
- Approved
- Completed Date:
- 11/23/2022
- Assigned Staff:
- Bryce Bishop
- View Details
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 12/9/2022
- Assigned Staff:
- Bryce Bishop
- View Details
-
Courtesy Expiration Letter
- Status:
- Complete
- Completed Date:
- 10/14/2024
- Assigned Staff:
- Quincy Miller
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 8/15/2022
- Assigned Staff:
- Planning Administrator
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 10/20/2022
- Assigned Staff:
- Bryce Bishop
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 10/25/2022
- Assigned Staff:
- Bryce Bishop
- View Details
Info