Land Use Action Details
22 111076 00 RP
- Number
- 22 111076 00 RP
- Type
- Site Plan Review - NO LONGER USED - Site Plan Review - Class 3 - New
- Status
- Completed - Approved
- Case Number
- SPR-ADJ22-31
- Details
- 2980 RIVER ROAD N
- Description
- Summary: A proposal to construct a new Fred Meyer fueling station with associated site improvements. Request: A consolidated application containing a Class 3 Site Plan Review to construct a new 5,418-square-foot overhead fuel canopy with 14 fueling positions, a 179-square-foot cashiers kiosk, and associated site improvements such as landscaping and vehicle parking. The application includes a Class 2 Adjustment request to reduce the minimum development site landscaping standard from 15 to 3.2 percent. The subject property is approximately 0.89 acres in size, zoned CR (Retail Commercial), and located at 2980 River Road N (Marion County Assessor map and tax lot number: 073W15AA / 9400).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
REQUEST FOR COMMENTS Affidavit 2 | PDF - Adobe | 568 KB | View/Download |
REQUEST FOR COMMENTS Affidavit | PDF - Adobe | 596 KB | View/Download |
NOD Affidavit | PDF - Adobe | 385 KB | View/Download |
NOF Affidavit | PDF - Adobe | 87 KB | View/Download |
Decision | PDF - Adobe | 7 MB | View/Download |
115 - Public Works Memo | PDF - Adobe | 243 KB | View/Download |
114-Comment from Jones and CCSF | PDF - Adobe | 160 KB | View/Download |
114-Comment with No Name | PDF - Adobe | 151 KB | View/Download |
82-NA Contact | PDF - Adobe | 126 KB | View/Download |
Plan Set_Merged | PDF - Adobe | 6 MB | View/Download |
114-Comment from BAS | PDF - Adobe | 72 KB | View/Download |
100-102 NOF-RFC | PDF - Adobe | 3 MB | View/Download |
69-Detailed-Site-Plan | PDF - Adobe | 501 KB | View/Download |
69-Overall-Site-Plan | PDF - Adobe | 747 KB | View/Download |
66-Grading-Plan-REV02 | PDF - Adobe | 1 MB | View/Download |
62-Utility-Plan-REV02 | PDF - Adobe | 1 MB | View/Download |
61-Existing-Conditions-REV02 | PDF - Adobe | 910 KB | View/Download |
60-Site-Plan-REV02 | PDF - Adobe | 1018 KB | View/Download |
68-Civil-Set-Cover-Sheet-REV01 | PDF - Adobe | 1 MB | View/Download |
73-Stormwater-Management-Report-REV01 | PDF - Adobe | 7 MB | View/Download |
67-Landscape-Plan-Sheet-L-2-REV01 | PDF - Adobe | 1 MB | View/Download |
63-Landscape-Plan-REV02 | PDF - Adobe | 687 KB | View/Download |
74-Geotechnical-Report | PDF - Adobe | 2 MB | View/Download |
71-Traffic-Impact-Analysis | PDF - Adobe | 8 MB | View/Download |
54-Written-Statement-REV02 | PDF - Adobe | 445 KB | View/Download |
51-Deeds | PDF - Adobe | 380 KB | View/Download |
52-Ownership Information | PDF - Adobe | 1 MB | View/Download |
50-Application | PDF - Adobe | 249 KB | View/Download |
Person Details
CASEY MCKEON
- Roles
- Applicant
- Organization
- HESLIN HOLDINGS LLC
- Address
-
23421 SOUTH POINTE DR
LAUNA HILLS CA 92653
Property Details
Info
- Zoning
- CR
- Comprehensive Plan
- COM
- Adjacent Neighborhood Association 1
- None
- Adjacent Neighborhood Association 2
- None
- Neighborhood Association
- Highland Neighborhood Association
- Overlay Zone
- None
- Ward #
- 5
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 6/28/2022
- Assigned Staff:
- Robin Dalke
- View Details
-
PW Memo
- Status:
- Complete
- Completed Date:
- 7/12/2022
- Assigned Staff:
- Laurel Christian
- View Details
-
PW Final Report
- Status:
- Complete
- Completed Date:
- 7/12/2022
- Assigned Staff:
- Laurel Christian
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Brandon Pike
-
Building and Safety Comments
- Status:
- Closed
- Completed Date:
- 6/17/2022
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Closed
- Completed Date:
- 6/23/2022
- Assigned Staff:
- Fire Marshal
- View Details
-
Decision
- Status:
- Approved
- Completed Date:
- 7/18/2022
- Assigned Staff:
- Aaron Panko
- View Details
-
Courtesy Expiration Letter
- Status:
- Open
- Assigned Staff:
- Brandon Pike
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 8/3/2022
- Assigned Staff:
- Aaron Panko
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 5/27/2022
- Assigned Staff:
- Brandon Pike
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 6/15/2022
- Assigned Staff:
- Brandon Pike
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 6/17/2022
- Assigned Staff:
- Brandon Pike
- View Details
Info