Land Use Action Details
21 101693 00 ZO
- Number
- 21 101693 00 ZO
- Type
- Zoning - NO LONGER USED - Zoning Adjustment - Class 2 - New
- Status
- Approved with Conditions
- Case Number
- SPR-ADJ-DAP-DR21-13
- Details
- 1610 LANCASTER DR SE
- Description
- Summary: A proposal to construct a 6-unit apartment building while retaining an existing single family dwelling. Request: A consolidated application containing a Class 3 site plan review and Class 1 design review for the development of a new apartment building with associated site improvements, a Class 2 driveway approach permit to allow driveway access onto 40th Place SE, and Class 2 adjustment requests to: 1) Reduce the minimum setback for buildings to the north property line from 10 feet to 6 feet; 2) Reduce the minimum setback for vehicle use areas to the south property line from 10 feet to 4.67 feet; 3) Allow a portion of an off-street parking area to be located between a building and a street; and 4) Adjust a vision clearance area for the proposed driveway approach. The subject property is approximately 0.40 acres in size, zoned RM-II (Multiple Family Residential-II), and located at 1610 Lancaster Drive SE (Marion County Assessor map and tax lot number(s): 082W06AB / 9200).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
REQUEST FOR COMMENTS Affidavit 2 | PDF - Adobe | 670 KB | View/Download |
REQUEST FOR COMMENTS Affidavit | PDF - Adobe | 616 KB | View/Download |
50 - Application | PDF - Adobe | 390 KB | View/Download |
Person Details
JORDAN SCHWEIGER
- Roles
- Applicant
- Address
-
7675 STATE ST
SALEM OR 97317
GOOD WELL CONSTRUCTION INC
- Roles
- Applicant
- Address
-
2825 FOXHAVEN DR SE
SALEM OR 97306
Property Details
Info
- Comprehensive Plan
- MF
- Zoning
- RM2
- Overlay Zone
- None
- Neighborhood Association
- Southeast Mill Creek Association (SEMCA)
- Ward #
- 3
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 5/5/2021
- Assigned Staff:
- PW Coordinator
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Brandon Pike
-
Building and Safety Comments
- Status:
- Complete
- Completed Date:
- 5/12/2021
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Complete
- Completed Date:
- 5/6/2021
- Assigned Staff:
- Fire Marshal
- View Details
-
Decision
- Status:
- Approved with Conditions
- Completed Date:
- 6/25/2021
- Assigned Staff:
- Brandon Pike
- View Details
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 7/14/2021
- Assigned Staff:
- Brandon Pike
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 1/19/2021
- Assigned Staff:
- Brandon Pike
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 5/4/2021
- Assigned Staff:
- Brandon Pike
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 5/5/2021
- Assigned Staff:
- Brandon Pike
- View Details
Info