Land Use Action Details
20 101380 00 LD
- Number
- 20 101380 00 LD
- Type
- Land Division - NO LONGER USED - UG Preliminary Declaration - New
- Status
- Approved with Conditions
- Case Number
- SPR-UGA-ADJ20-06
- Details
- 1965 CLAXTER RD NE
- Description
- Summary: A proposal to construct a 22,600 square-foot building at an existing food processing facility, with associated site improvements. Request: A consolidated application containing the following requests: 1) A Class 3 Site Plan Review to construct a 22,600 square-foot building with associated site improvements at an existing food processing facility, classified as a general manufacturing use; 2) An Urban Growth Area Preliminary Declaration to determine the public facilities required to fully serve the development; 3) A Class 2 Adjustment to reduce the minimum vehicle use area setback to the private roadway easement from 20 feet to 6 feet; and 4) A Class 2 Adjustment to reduce the minimum accessory structure setback to the private roadway easement from 20 feet to 6 feet. The development site is zoned IP (Industrial Park), is approximately 2 acres in size, and is located at 1965 Claxter Road NE (Marion County Assessor map and tax lot number: 073W01C / 03001).
Attachments
Description | File Type | File Size | Download |
---|---|---|---|
50-Application | PDF - Adobe | 1 MB | View/Download |
Person Details
LIVERMORE ARCHITECTURE AND ENGINEERING INC
- Roles
- Applicant
- Address
-
1500 SW 1ST AV STE 240
PORTLAND OR 97201
Property Details
Info
- Comprehensive Plan
- IND
- Zoning
- IP
- Overlay Zone
- None
- Neighborhood Association
- Northgate Neighborhood Association
- Adjacent Neighborhood Association 1
- None
- Ward #
- 5
Action Details
Plan Review
-
PW Coordinator Setup
- Status:
- Complete
- Completed Date:
- 1/31/2020
- Assigned Staff:
- PW Coordinator
- View Details
-
PW Memo
- Status:
- Complete
- Completed Date:
- 1/31/2020
- Assigned Staff:
- PW Coordinator
- View Details
-
PW Final Report
- Status:
- Complete
- Completed Date:
- 1/31/2020
- Assigned Staff:
- PW Coordinator
- View Details
Info
Planning Division
-
Withdrawn
- Status:
- Open
- Assigned Staff:
- Brandon Pike
-
Building and Safety Comments
- Status:
- Complete
- Completed Date:
- 1/31/2020
- Assigned Staff:
- Claude Kennedy
- View Details
-
Fire Comments
- Status:
- Complete
- Completed Date:
- 2/3/2020
- Assigned Staff:
- Fire Marshal
- View Details
-
Decision
- Status:
- Approved with Conditions
- Completed Date:
- 3/17/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Appeal Period
- Status:
- Complete
- Completed Date:
- 5/8/2020
- Assigned Staff:
- Brandon Pike
- View Details
Info
Setup
-
Assign Case Planner
- Status:
- Assigned Planner
- Completed Date:
- 1/3/2020
- Assigned Staff:
- Planning Administrator
- View Details
-
Completeness Review
- Status:
- Complete
- Completed Date:
- 1/30/2020
- Assigned Staff:
- Brandon Pike
- View Details
-
Deem Complete
- Status:
- Deemed Complete
- Completed Date:
- 1/31/2020
- Assigned Staff:
- Brandon Pike
- View Details
Info