1 |
|
3/1/2022 |
Clint Barber |
Inspected |
220' 8" to catch basin south side,8" ductile east to west, 10" east side running North-South. |
2 |
|
3/3/2022 |
Clint Barber |
Inspected |
60' Manhole. |
3 |
|
3/16/2022 |
Clint Barber |
Inspected |
West-side storm to planters. |
4 |
|
3/18/2022 |
Clint Barber |
Corrections |
Inspection was for underfloor. |
5 |
|
3/30/2022 |
Clint Barber |
Corrections |
WRONG INSPECTION CALLED IN. |
6 |
|
4/1/2022 |
Clint Barber |
Inspected |
West Side 8" -10" pipe, catch basins flow control for storm. |
7 |
|
4/11/2023 |
Clint Barber |
Inspected |
Partial- Ductile Northwest side Catch basin, cleanout, piping for planter. |
8 |
|
5/3/2023 |
Matthew Smith |
Inspected |
STORM TIE IN TO SE CORNER OF BUILING INTO PLANTER |
9 |
|
5/23/2023 |
Clint Barber |
Inspected |
Planter boxes piping North, West, South. |