Development Permit Details
24 103963 00 PC
- Number
- 24 103963 00 PC
- Type
- Public Construction - PW - Subdivision - Water/Sewer/Street/Storm
- Status
- Accepted
- Details
- PC_WALN CREEK CROSSING
- Description
- 4-Lot Subdivision "WALN CREEK SUBDIVISION". A Subdivision Tentative Plan to divide the approximate 1.71-acre property into four lots ranging in size from approximately 5,311 square feet to 47,701 square feet; 2) A Conditional Use Permit to allow two of the lots in the subdivision (Lots 2 and 3) which are partially zoned IC (Industrial Commercial) to be developed with single family dwellings; 3) A Class 2 Adjustment to: a) Increase the number of flag lots allowed within the subdivision from a maximum of one to two (SRC 800.025(e)); b) Designate the south property line of Lot 1 abutting the flag lot accessway as the front lot line rather than the property line abutting Mildred Lane SE (SRC 800.020(a)(1)); c) Allow single family dwellings constructed as part of a subdivision to take access onto a minor arterial street (SRC 804.035(c)(4)); and d) Reduce the minimum required 370-foot driveway spacing between Marstone Court SE and the proposed flag lot accessway serving Lots 1, 2, & 3 (SRC 804.035(d)); and 4) A Class 2 Driveway Approach permit for the proposed flag lot accessway onto Mildred Lane SE. The subject property is zoned RA (Residential Agriculture) and IC (Industrial Commercial), approximately 1.71 acres in size, and located in the 1300 Block of Mildred Lane SE (Marion County Assessor Map and Tax Lot Number: 083W14CB02401).
Person Details
Z EXCAVATION INC
- Roles
- Contractor
- Address
-
PO BOX 1346
SILVERTON OR 97381-0347
STEVEN JOHNSON
- Roles
- Engineer
- Organization
- 7OAKS ENGINEERING
- Address
-
345 WESTFIELD ST UNIT 107
SILVERTON OR 97381
Property Details
Action Details
Agreements
-
Improvement Agreement
- Status:
- Approved
- Completed Date:
- 9/9/2024
- Assigned Staff:
- Curtis Pellatz
- View Details
Info
Application Intake
-
Make Ready To Issue (DS)
- Status:
- Approved
- Completed Date:
- 8/20/2024
- Assigned Staff:
- Curtis Pellatz
- View Details
-
Assign Bin Number
- Status:
- Open
- Assigned Staff:
- PW Coordinator
Info
Plan Review
-
Planning Plan Review
- Status:
- Approved
- Completed Date:
- 7/8/2024
- Assigned Staff:
- Bryce Bishop
- View Details
-
Floodplain Development Review
- Status:
- Approved
- Completed Date:
- 5/17/2024
- Assigned Staff:
- Robin Dalke
- View Details
-
DS Plan Review
- Status:
- Approved
- Completed Date:
- 7/10/2024
- Assigned Staff:
- Curtis Pellatz
- View Details
-
Fire Review
- Status:
- Approved
- Completed Date:
- 2/28/2024
- Assigned Staff:
- Deputy Fire Marshal
- View Details
Info
PW Inspections
-
As-Built Review
- Status:
- Complete
- Completed Date:
- 6/20/2025
- Assigned Staff:
- PW Engineering
- View Details
-
10 month warranty inspection
- Status:
- Open
- Assigned Staff:
- PW Inspector
-
Stormwater Treatment Inspection
- Status:
- Approved
- Completed Date:
- 4/23/2025
- Assigned Staff:
- PW Inspector
- View Details
-
Acceptance
- Status:
- Accepted
- Completed Date:
- 4/25/2025
- Assigned Staff:
- PW Engineering
- View Details
-
Erosion Control Inspection
- Status:
- Approved
- Completed Date:
- 4/23/2025
- Assigned Staff:
- PW Inspector
- View Details